Installation
Installation
Installation and
and
and Wiring
Wiring
Wiring
To reduce the risk of fire, explosion, or electric
shock, only install equipment in a hazardous
location if the equipment is approved for a
hazardous location.
Planning
Planning
Planning the
the
the Installation
Installation
Installation
Installation of the Intelligent Paint Kitchen must be
carefully planned before ordering the system. The
number of stations must be known. The location,
size, and type of each component must be taken
into account to ensure that the correct number of
Supervisor Boxes, fiber optic converters, Variable
Frequency Drives/Inverters, and cables are on hand,
and that pneumatic and electrical power are available
for all devices in the system.
Be sure you know the distance between each pump
and the planned location of the components located
in the non-hazardous location so the optical fiber
connections can be made.
NOTE:
NOTE:
NOTE: Include filters, shutoff and drain valves, and
pneumatic controls in the fluid circulation system as
needed. All station components must be suitable for
system volumes, pressures, and flow rates. Proper
station layout and construction is the responsibility
of the user.
Refer to for additional guidance in designing an
Intelligent Paint Kitchen system.
Overview
Overview
Overview of
of
of Installation
Installation
Installation Steps
Steps
Steps
Each Intelligent Paint Kitchen installation is unique
and varies, depending on the number of stations, the
configuration, and the specific components being
used.
The following general steps apply to most Intelligent
Paint Kitchens:
1.
Mount the components (Supervisor Box, Variable
Frequency Drive, Touchscreen Box, and DC
Power Supply with Barrier) in the non-hazardous
location.
2.
Make all required ground connections.
3.
Connect the components together in the
non-hazardous location.
4.
Use a fiber optic cable to connect the components
in the non-hazardous location to each station in
the hazardous location.
Before
Before
Before Installation
Installation
Installation
Before installation, verify the following:
• All system and component documentation is
available during installation.
• Component manuals have been reviewed for
specific data on component requirements.
• All accessories are adequately sized and
pressure-rated to meet system requirements.
• Design the non-hazardous location component
layout. Decide where the Touchscreen Box (if
used), each Supervisor Box, each Expansion Box,
each Variable Frequency Drive/Inverter, and each
DC Power Supply will be located.
• Components installed in the hazardous location
must be installed using the instructions in the
manual for each component.
Check
Check
Check Resistance
Resistance
Resistance
To reduce the risk of fire, explosion, or electric
shock, the resistance between the Intelligent Paint
Kitchen components and true earth ground must
be less than 1 ohm.
Check the resistance between each Intelligent Paint
Kitchen component and true earth ground. If the
resistance is 1 ohm or greater, a different ground
may be required. Do not operate the system until the
problem has been corrected.
3A4030C
25