Setup
3A0245A
7
Setup
1.
Turn power switch to OFF and connect power cord.
2.
Connect material hose (DD) to fluid manifold outlet
(BB).
NOTE: Up to 150 ft of 1/2 in. plus 15 ft. x 1/4 in. hose
can be connected to the unit. If desired flow rate is not
obtainable, reduce hose length or add additional water
to material mixture.
3.
Use fitting (EE) to connect to hose (FF) and hose
(DD).
4.
Use coupling (GG) to connect hose (FF) and Z
swivel (HH).
5.
Connect Inline Controller Valve (JJ) if taping or finish-
ing corners.
6.
Connect selected finishing tool using supplied
quick-connect clamps. See Using Finishing Tools,
page 11.
7.
Select 15A/20A setting based on your circuit rating
(North America only).
NOTE: 20A setting will produce the best performance.
Digital Tracking System (DTS)
Operation Main Menu
Short press to move to next display. Press and hold (5 sec-
onds) to change units or reset.
1.
Turn flow control knob fully counterclockwise to OFF
position. Perform Pressure Relief Procedure, page
6.
2.
Turn power ON. Pressure display appears. Dashes
will not appear unless pressure is less than 200 psi
(14 bar, 1.4 MPa).
Change Display Units
Press and hold DTS button for 5 seconds to change pres-
sure units (psi, bar, MPa) to desired units. Selection of bar
or MPa changes gallons to liters x 10. To change display of
units, DTS must be in flow control mode and pressure must
be at zero.
Job Gallons
1.
Short press DTS button to move to Job Gallons (or
liters x 10).
ti4265a
ti4265a
ti2810a
EE
FF
GG
HH
JJ
ti15635a
BB
DD
20
ti15622a
ti13605a
ti8793a
psi
ti4266a
ti13621a
Psi
bar
Psi
MPa
ti13620a
ti13604a
Содержание 257100
Страница 30: ...Notes 30 3A0245A Notes...