Installation
12
3A0233B
Mount Power-Flo, Check-Mate
200, Fire-Ball 300 and Fire-Ball
400 Pumps
NOTE:
The Pump Mounting Chart on page 3 lists the parts
necessary to mount Power-Flo, Check-Mate 200,
Fire-Ball 300 and Fire-Ball 425 pumps on this ram.
Installing other pumps on the ram may require alter-
nate parts. For information, contact your Graco dis-
tributor.
1.
Position the mounting brackets (42) so that the top
of the pump will clear the support beam (4).
2.
For President, Monark Check-Mate 200, and
Fire–Ball Pumps only, install the mounting plate
(CA) onto the mounting brackets (42) using four
screws (CB) and lockwashers (CC). See F
. 9.
NOTE: The plate (CA) is oriented differently for the
President and Fire–Ball 425 than for the Monark and
Fire–Ball 300.
3.
Attach the motor to the mounting brackets (42) or
mounting plate (CA) with the fasteners supplied, as
applicable.
NOTE: Before proceeding to step 4, install Adapter
Kit 224267 for the Fire–Ball 300 pump. Install
Adapter Kit 224266 for Fire–Ball 425, 50:1 and 75:1
Pump.
4. Slide the top seal plate (CG) up over the pump intake
valve and push the seal (CF) onto the pump intake
housing. Leave the bottom seal plate (CG) and gasket
(CH) in place. See F
5. Loosen the mounting bracket setscrews (35), and
carefully lower the pump until the intake valve is below
the gasket (CH), then tighten the setscrews.
6. Push the seal (CF) down firmly against the bottom
seal plate (CG).
7. Align the holes in the top seal plate with the holes in
the ram plate (114). Secure tightly to the ram plate with
the four screws (CD) and washers (CC).
F
IG
. 9
For President and Fire-Ball 425 Pumps
For Monark and Fire-Ball 300 Pumps
r_257435_3a0233_3c
CA
CC
CB
CC
CB
CA
r_257435_3a0233_2c
F
IG
. 10
02938
CF
CD, CC
CG
114
CG CH
Содержание 24C769
Страница 19: ...Repair 3A0233B 19...