6
306–694
Installation
KEY
A
Pump Runaway Valve
B
Air Line Lubricator
C
Bleed–Type Master Air Valve (required)
D
Pump Air Regulator
E
Air Line Filter
F
Check Valve
G
Fluid Drain Valve (required)
H
Surge Tank
J
Fluid Shutoff Valve
K
Fluid Pressure Regulator
L
Spray Gun
M
Back Pressure Regulator
N
Director Valve
P
Fluid Suction Hose
Q
Suction Tube
R
Packing Nut/Wet–Cup
S
Drain Back Tube
T
Drain Tube
Y
Ground Wire (required)
J
A
B C
D
E
F
G
H
K
L
N
Y
R
S
C
J
Q
T
P
M
MAKE VERTICAL LOOP
MAIN AIR LINE
FLUID SUPPLY LINE
FLUID RETURN LINE
1/2” (13 mm)
Typical Installation