62
4-2: Turn the right knob of the Belt Tensioner
counter clockwise and remove the tensioner knobs.
Tools Needed:
3mm Allen Wrench
Parts Needed:
4-1: Place the most curly end of the Long Belt into
the Back Belt Clamp. Place the Front Belt Clamp
over the belt and attach to the left side of the
frame using (2) M5 x 20mm SBHCS.
|
Q’nique Frame
QuiltMotion
Belt Tensioner (2)
Long Belt (1)
Front Belt
Clamp (1)
Back Belt
Clamp (1)
M5 x 20mm
SBHCS (2)
M5 x 10mm
SBHCS (2)
Step 4 - Long Belt Installation
M5 x 20mm SBHCS
Front Belt Clamp
Back Belt Clamp
Long Belt
Содержание QuiltMotion
Страница 28: ...19 Continuum Frame QuiltMotion Proceed to QCT and Wiring Instruction Booklet ...
Страница 45: ...36 See Your QCT and Wiring Instructions Booklet Q Zone Queen Frame QuiltMotion ...
Страница 62: ...53 See Your QCT and Wiring Instructions Booklet Q Zone Hoop Frame QuiltMotion ...
Страница 79: ...70 See Your QCT and Wiring Instructions Booklet Q nique Frame QuiltMotion ...
Страница 80: ...71 Pinnacle Frame QuiltMotion Next Generation QuiltMotion GQ QuiltMotion ...
Страница 105: ...96 See Your QCT and Wiring Instructions Booklet Pinnacle Next Generation GQ QuiltMotion ...
Страница 106: ...97 SR2 Frame QuiltMotion SR2 Frame QuiltMotion ...
Страница 126: ...117 See Your QCT and Wiring Instructions Booklet SR2 SR2 Frames QuiltMotion ...
Страница 142: ...133 See Your QCT and Wiring Instructions Booklet Bernina and Bernina V2 QuiltMotion ...
Страница 160: ...151 GMQ Pro Frame QuiltMotion Little Gracie II Frame QuiltMotion ...
Страница 177: ...168 GMQ Pro Little Gracie II QuiltMotion See Your QCT and Wiring Instructions Booklet ...
Страница 195: ...186 See Your QCT and Wiring Instructions Booklet Gracie King Queen Frame QuiltMotion ...
Страница 197: ...188 ...
Страница 198: ...The Grace Company 2225 South 3200 West Salt Lake City UT 84119 ...