GPI LM50DB Скачать руководство пользователя страница 2

2

CAUTION

METER DISASSEMBLY

PARTS DIAGRAM

Ensure the fluid supply to the meter is disconnected and
the line pressure is released before disassembly.

METER REASSEMBLY

1) Replace both rotors (4) so as they are at 90

O

 

to each other.

    (see fig 2).  Check the rotor rotation by turning either of the
   rotors. If the rotors are not in mesh correctly or do not
  rotate freely remove one of the rotors and replace it
   correctly at 90

0

 to the other rotor. Re-check the operation of

    the rotors.

5) Test the meter by turning the rotors with a finger or by
   applying low air pressure (No more than a good breath)
   to the inlet port of the meter. This will confirm the meter
    is operating correctly.

1

2

5

6

7

4

3

PARTS LIST

BATTERY REPLACEMENT

1) Remove the plastic protector shroud from the meter
    body. (fig 1)

3) Replace the 2 x (AAA) Alkaline batteries. (Refer to the
    front of the meter for correct battery orientation).

Note: Only use Alkaline batteries.

If NO flow goes through the meter for 60 seconds the display
will go into sleep mode (Blank). The display will
automatically wake if the buttons are pressed or flow occurrs.

SLEEP MODE

Note: 

The electronic computer module is non-repairable. The

meter will need to be replaced if found to be damaged or faulty.

1) Remove the 8 x philips head screws (1) from the meter
    cover.

2) Remove the meter cover (2) and  o’ring (3).

3) Remove both rotors (4).

4) Clean and inspect all parts. Replace any suspect, worn or
     damaged components.

NOTE:

 Ensure the rotor with the magnets is assembled on

the same side as the batteries.  The magnets in the rotor must
face towards the electronic display .

The Rotor with Magnets

( fig 2)

(fig 1)

magnets

Note:

 Replace the batteries as soon as the battery

          indicator on the LCD is displayed

+ -

2) Remove the battery cover.

4) Replace the battery cover and re-fit the plastic shroud.

All data will be saved when the batteries are removed.

2) Lightly grease the o’ring (3) and place it on the meter body.

3) Clean the meter cover plate (2) and place it on the body.
    Take care not to damage the o’ring (3).

4) Install the 8 screws (1) and tighten in a diagonal pattern to
    1nm (0.73 ft.lb). Visual check the cap has been pulled down
   evenly.

Protector Shroud

(fig 3)

ORDER FOR REPLACEMENT

ITEM

PA RT NO

No. of f PA RT/SET

DESCRIPTION

1

N65

8

           LM50K02

SCREW SET

2

IM011

1

METER COVER PLATE SET

3

BS035

1

            LM50K01

O'RING SEA L

4

IM020

2

ROTOR  SET

5

1

N/A

METER BODY

6

 2

N/A

BATTERY  

SET

7

 

1

N/A

BATTERY  COV ER SET

8

IM070-BLUE 

1

LM50K03

PROTECTOR SHROUD SET 

Содержание LM50DB

Страница 1: ...er has incorporatedtheovalrotorprincipalintoitsdesign Thishas proven to be a highly reliable and highly accurate method of measuring flow providing exceptional repeatability and high accuracy GPI reco...

Страница 2: ...nic computer module is non repairable The meter will need to be replaced if found to be damaged or faulty 1 Remove the 8 x philips head screws 1 from the meter cover 2 Remove the meter cover 2 and o r...

Страница 3: ...oint 25 change non resetable accumulative total units 26 change non reset accumulative total decimal point 22 change batch total decimal point 27 change K factor 31 change flowrate units 32 change flo...

Страница 4: ...1 1 decimal place 27 K FACTOR kFac 27 normal setting is 112 00 pulses b Press RESET 7 times kFac 27 will appear c Press and hold down RESET for 2 seconds program will appear To change the K factor pr...

Страница 5: ...nds program will appear e Press RESET to select sleep setting no sleep sleep 5 f Press and hold down RESET until program disappears to accept setting f Press and hold down RESET until program disappea...

Страница 6: ...1 DIAGNOSTICS dIA 7 diagnostic mode b Press the DISP button 5 times to reach dIA 7 c Press RESET dIA 71 will appear d Press and hold down RESET for 2 seconds Program will appear then all the segments...

Страница 7: ...7 NOTES...

Страница 8: ...n d to th e p u r c h a s e r o f th is p r o d u c t a n d to a n y p e r s o n to w h o m s u c h p r o d u c t is tr a n s fe r r e d d u r in g th e w a r r a n ty p e r io d T h e w a r r a n ty...

Отзывы: