For Professional Technical Support call 1-844-242-2475 7
1.
Connect
1-1/4in. Drive Coupling
to
well
point.Thread
1-1/4in.Galv.Steel Pipe
into
Drive
Coupling.
(Fig. 1)
2.
Thread
1-1/4 in. Lead Free Brass Check Valve
into
Steel nipple .Install
1-1/4in. × 3in.
Galv. Steel Nipple
into the check valve. (For easy priming connect the
check valve as close to the well as possible) (Fig. 2)
3. Install
1-1/4in.PVC TEE FPT×FPT×FPT
to the nipple
.
One end of horizontal port install another
1-1/4in. PVC
MPT×S Male Adapter
and
1-1/4 in.
PVC rigid
Pipe
.Add sections of pipes to reach the 1-1/4in. PVC
Slip ×Slip Union (optional). (Fig. 3)
For Surface water Installation
1.
Connect
1-1/4in.Brass Foot Valve
to
1-1/4in. PVC
MPT×S Male Adapter
.
Cement adapter to
1-1/4 in.
PVC rigid Pipe
.
All connections must be air- and
water-tight for pump to operate correctly. (Fig 1)
2.
Install screen surround the foot valve, protect the foot
valve assembly from fish, trash, etc. Position the
foot
valve 5 feet above bottom of well and It should also be
at least 10 feet below the water level in order to
prevent the pump from sucking air.
(Fig 2)
3.
Cement
1-1/4in. PVC MPT×S Male Adapter
into
1-1/4 in. PVC rigid Pipe.
Install
1-1/4in.PVC TEE
FPT×FPT×FPT
to adapter.
One end of horizontal port
install another
1-1/4in. PVC MPT×S Male Adapter
and
1-1/4 in.
PVC rigid Pipe
. Add sections of pipes to
reach the 1-1/4in. PVC Slip ×Slip Union
(optional ).(Fig. 3)