STEP 51: ATTACHING THE SLIDE TO THE FORT
1: ATTACH SLIDE ENTRY ASSEMBLY TO THE CORNER POST AND CENTER POST OF THE FORT WITH 5/16 X 3-1/2" LAG
SCREWS WITH 5/16" WASHERS.
2: DO NOT ATTACH THE BOTTOM RIGHT HOLE OF THE SLIDE ENTRY PLATE AT THIS TIME.
LEAVE THIS HOLE EMPTY
5/16" WASHER
5/16 X 3-1/2"
LAG SCREW
Содержание Blue Ridge Mountaineer 2009
Страница 24: ...DESCRIPTION PICTURE QTY W CHAINS RAD RIDE 5 1 BAR 1 ASSEMBLY 1 LADDER ROPE W CHAINS TRAPEZE SWINGS 2 ...
Страница 26: ...PICTURE DESCRIPTION QTY IRON DUCTILE SWING HANGERS TIC TAC TOE ASSEMBLY 10 ROPE 6 1 1 ...
Страница 27: ...1 1 2 X 1 1 2 GREEN BRACKET SPRING CLAMP 4 6 SAFETY HANDLE PAIR 1 PICTURE DESCRIPTION QTY ...
Страница 28: ...PICTURE DESCRIPTION QTY 10 RADICAL WAVE SLIDE 1 1 TELESCOPE UNASSEMBLED CHIMNEY 1 UNASSEMBLED DORMER 2 ...