© 2009 G O RILLA PLA YSETS
STEP 48: UPPER LEVEL BO TTO M PA NEL BO A RD
1: O NE 2 X 6 X 30-1/ 4" UPPER LEVEL BO TTO M PA NEL BO A RD IS USED IN THIS STEP, O FFSET HO LES DO W N, O N THE
REA R O F THE FO RT. LINE THE TO P HO LES O F THE UPPER LEVEL BO TTO M PA NEL BO A RD W ITH THE HO LES IN THE
C O RNER PO ST.
2: THE BO A RD W ILL SEC URE TO THE FO RT USING O NE 5/ 16 X 4-1/ 2" HEX BO LT W ITH A 5/ 16" W A SHER, FO LLO W ED
BY O NE 5/ 16 X 3-1/ 2" LA G SC REW W ITH A 5/ 16" W A SHER. USE A LEVEL TO M A KE SURE THE BO A RD IS INSTA LLED
PRO PERLY.
3: NO HA RDW A RE W ILL BE USED O N THE SIDE A T THE C ENTER PO ST A T THIS TIM E
HEX BO LT
5/ 16" W A SHER
LA G SC REW
5/ 16 X 3-1/ 2"
BO TTO M PA NEL BO A RD
(O FFSET HO LES DO W N)
2 X 6 X 30-3/ 4"
UPPER LEVEL SIDE
5/ 16 X 4-1/ 2"
BIG SKYE I O NLY
Содержание Blue Ridge Big Skye I
Страница 28: ...10 WAVE SLIDE 1 RAD RIDE TUBE SLIDE 1 TRAPEZE BAR W C HAINS 1 SWING S W C HAINS 2 PIC TURE DESC RIPTIO N Q TY...
Страница 30: ...IRO N DUC TILE SWING HANG ERS TELESC O PE PERISC O PE 6 1 1 PIC TURE DESC RIPTIO N Q TY...
Страница 31: ...PIC TURE DESC RIPTIO N Q TY STEERING WHEEL RO PE LADDER STEPS SAFETY HANDLES PAIR 1 6 2...
Страница 32: ...1 1 2 X 1 1 2 G REEN BRAC KET SPRING C LAMP 1 4 6 MO DEL II 2 SAFETY PADS MO DEL I PIC TURE DESC RIPTIO N Q TY...
Страница 34: ...1 1 2 TIC TAC TO E PANEL UNASSEMBLED C HIMNEY UNASSEMBLED DO RMER G LIDER SWING 1 PIC TURE DESC RIPTIO N Q TY...