DEC K SUPPO RT
UPPER LEVEL
BO LT
TO RQ UE W A SHER
4 X 4 X 58"
6-1/ 2" C A RRIA G E
BO LT C A P
3/ 8" W A SHER
3/ 8" LO C K NUT
STEP 40: UPPER LEVEL DEC K SUPPO RT
1: THE 4 X 4 X 58” UPPER LEVEL DEC K SUPPO RT W ILL MO UNT TO THE C O RNER PO STS USING 6-1/ 2” C A RRIA G E BO LTS
W ITH TO RQ UE W A SHERS FRO M THE O UTSIDE.
2: USE 3/ 8” LO C K NUTS A ND 3/ 8” W A SHERS IN THE C O UNTER-SUNK HO LES O F THE UPPER LEVEL DEC K SUPPO RT.
3: C O VER A NY EXPO SED THREA DS W ITH BO LT C A PS.
© 2009 G O RILLA PLA YSETS
Содержание Blue Ridge Big Skye I
Страница 28: ...10 WAVE SLIDE 1 RAD RIDE TUBE SLIDE 1 TRAPEZE BAR W C HAINS 1 SWING S W C HAINS 2 PIC TURE DESC RIPTIO N Q TY...
Страница 30: ...IRO N DUC TILE SWING HANG ERS TELESC O PE PERISC O PE 6 1 1 PIC TURE DESC RIPTIO N Q TY...
Страница 31: ...PIC TURE DESC RIPTIO N Q TY STEERING WHEEL RO PE LADDER STEPS SAFETY HANDLES PAIR 1 6 2...
Страница 32: ...1 1 2 X 1 1 2 G REEN BRAC KET SPRING C LAMP 1 4 6 MO DEL II 2 SAFETY PADS MO DEL I PIC TURE DESC RIPTIO N Q TY...
Страница 34: ...1 1 2 TIC TAC TO E PANEL UNASSEMBLED C HIMNEY UNASSEMBLED DO RMER G LIDER SWING 1 PIC TURE DESC RIPTIO N Q TY...