STEP 7: LEVELING THE PLAY SET AND LAGS
1: INSTALL LAG SCREWS ONLY IN THE FOUR 2 X 6 BOARDS AT DECK HEIGHT AT THIS TIME. SQUARE EACH OF THESE
FOUR BOARDS TO THE CORNER POSTS AND THEN INSTALL THE LAG SCREWS. THIS IS TO MAKE THE STRUCTURE
RIDGID FOR THE LEVELING AND SQUARING PROCESS.
2: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO
LEVEL AND SQUARE THE STRUCTURE. HAVE AN ASSISTANT HELP YOU LIFT THE FRAME AS REQUIRED.
DO NOT
INSTALL
REMAINING LAG SCREWS UNTIL AFTER THE FRAME HAS BEEN LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT THE 5/16" X 3-1/2" LAG
SCREWS AND 5/16" WASHERS IN ALL OF THE REMAINING HOLES OF THE 2 X 6 PARTS ON THE FRONT, SIDES AND
REAR OF THE PLAY SET. NOTE: THERE WILL NOT BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG
SCREWS.
LAG SCREW
FRONT OF FORT
5/16" WASHER
5/16 X 3-1/2"
***IMPORTANT***
SQUARE BOARDS TO POSTS;THEN
INSTALL LAG SCREWS AND WASHERS
ONLY IN THESE FOUR 2X 6 BOARDS
FIRST. THEN LEVEL/SQUARE THE FRAME.
FINALLY, INSTALL LAG SCREWS IN THE
REMAINING 2 X 6 BOARDS.
51
Содержание 1500HWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 40: ...5 4 X 6 X 10 ROOF PEAK SUPPORT 125 6 1000 RPS 2 PICTURE DESCRIPTION QTY 30 ...
Страница 48: ...1 1 1 PICTURE DESCRIPTION QTY SLIDE WAVE WIKI SLIDE 03 0007 SCOOP 03 0013 10 SUPER RAD RIDE SLIDE 03 0002 38 ...
Страница 143: ...APPENDIX 133 ...
Страница 145: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 146: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 147: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...