THESE TWO HOLE LOCATIONS
WILL BE EMPTY ON YOUR SWING
BEAM. LINE THEM UP WITH THE
HOLES IN THE SWING LEG
BRACKET UNDER THE SWING BEAM.
STEP 23: REST SWING BEAM ON FORT
*TWO PEOPLE ARE REQUIRED FOR THIS STEP
1: LAY THE SWING BEAM ACROSS THE TOP OF THE FORT RAILINGS.THE END OF THE SWING BEAM WITH TWO EMPTY
HOLES SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE.
2: SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM.
59
Содержание 1500CTC
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 9: ...FRONT VIEW REAR VIEW ...
Страница 17: ...SANDBOX SEAT STEP 2 REMOVING SANDBOX SEATS 1 REMOVE THE TWO SANDBOX SEAT BOARDS TO ATTACH THE WALL BOARDS ...
Страница 64: ...PICTURE DESCRIPTION QTY 1 1 11 5018 SWING TELESCOPE 07 0001 HANGERS 11 4012 IRON DUCTILE CHANNEL BRACKET 6 29 ...
Страница 65: ...DESCRIPTION PICTURE QTY PAIR CLIP 07 0005 SPRING 11 5013 BRACKET GREEN 11 4003 4 6 90 SAFETY HANDLES 1pr 30 ...
Страница 127: ...APPENDIX 92 ...
Страница 129: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 130: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 131: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...