17
6 OPERATING
INSTRUCTIONS
6.1 ELECTRICAL
WIRING
•
The boiler is fed with 220 V. A regulator must be used in installations where the power
supply is below 205 V or above 230 V.
•
Control panel should be connected to a wall plug with an efficient ground system, which
is placed not far more than 50 cm. to boiler with a circuit breaker which has at least 3
mm gap between contacts. For this reason, if a new electrical installation is required,
3x1,5 TTR cables must be used.
•
All electrical installations must be carried out by authorized persons in accordance with
mandatory regulations and codes of practise.
THIS APPLIANCE MUST BE EARTHED!
6.2 PRE-FIRING
CHECKS
Before first operation of boiler right after installation, hydraulic circuit must be ready for
operation. To fill an open vented circuit, the valve on start level line from expansion tank is
opened, and the circuit is filled with main supply water. During filling the system all valves and
accessories on the lines must be checked for leakage. Filling is stopped, when water from start
level line is observed, closing the valve on this line. Right after that, hydraulic pressure is
marked on screen of the hydrometer. This will make re-filling operations during heating season
much easier, just feeding the system with fresh water until hydraulic pressure on screen
reaches the pre-marked value.
Before every firing make sure that;
1. Boiler and circuit are filled with water, and the hydraulic pressure is in the required
range.
2. All valves on the line (except by-pass lines and start level line) are in open position.
3. There is enough draught in chimney.
To fill a pressurised circuit, feed the fresh water from main supply line using either the
filling/drilling tap connection on the boiler rear sectiion, or the feeding line constructed within
the circuit. To purge the air contained in the system, use air relief valves on the hydraulic circuit,
on the radiators, and also spring pressure relief valve at boiler hot water outlet.
Do not turn on the control panel during the ignition period, leave it in STAND-BY
mode!
kotlovoy.com.ua
Содержание ECO HEAT 10 CA II PLUS
Страница 2: ...kotlovoy com ua ...
Страница 3: ...ПОСІБНИК З УСТАНОВКИ Й ОБСЛУГОВУВАННЯ kotlovoy com ua ...
Страница 42: ...INSTALLATION AND USER MANUAL kotlovoy com ua ...
Страница 74: ...kotlovoy com ua ...