background image

1

01    Safety Precaution

•  Please keep Power Off before any operations to avoid danger. Strictly follow all safety precautions 

outlined in this manual and safety labels on the equipment.

•  All installation operations should be performed by trained and knowledgeable technical personnel 

who are familiar with local standards and electric systems. 

•  Do not use the battery if it is defective, broken, or damaged.

•  Do not disassemble, modify, or replace any part of the battery without official authorization from 

GoodWe.

•  Damaged battery may leak electrolyte. Do not contact with the liquid leakage or volatile matter. Please 

contact GoodWe Technical Support for help immediately.

•  Transportation:

•  Protect the batteries and their components from damage during transportation and storage.

•  Take the weight of the battery into account and carefully lift the batteries.

•  Do not hit, pull, drag, or step on the batteries or put unrelated items into any part of the batteries.

•  The transportation must be carried out by trained professionals. All operations during the process have 

to be recorded.

•  Keep the equipment stable to avoid dumping, which can result in equipment damage and personal 

injuries.

•  In the event of a fire, please make sure that the carbon dioxide extinguisher or Novac1230 or FM-200 is 

nearby. The fire cannot be put out by water (ABC does not work for battery fire-fighting).

•  Firefighters are required to wear full protective clothing and self-contained breathing apparatus when 

fighting fires.

•  The battery may explode when the ambient temperature exceeds 150℃.

•  Please use appropriate tools and take protective measures when installing and maintaining heavy 

equipment. Improper operations will cause personal injuries.

•  Place the cables at least 30mm away from the heating components or heat sources, otherwise 

the insulation layer of the cables may be aging or broken due to the high temperature.

•  Tie the cables of the same type together, and place cables of different types at least 30mm apart. Do 

not place the cables entangled or crossed.

•   Anyone contact the leaked substance accidently has to do as following:

•  Breath in the leaked substance: Evacuate from the polluted area, and seek immediate medical 

assistance.

•  Eye contact: Rinse your eyes for at least 15 minutes with clean water and seek immediate medical 

assistance.

•  Skin contact: Thoroughly wash the touch area with soap and clean water, and seek immediate 

medical assistance.

•  Ingestion: Induce vomiting, and seek immediate medical assistance.

•  Do  not  move  the  battery  system  if  it  is  connected  with  external  battery  expansion  modules. 

Please contact After-sales Service to replace batteries or add batteries. 

DANGER!

WARNING!

CAUTION!

Содержание Lynx Home LX U5.4-L

Страница 1: ...Lynx Home U Series LV User Manual Ver 1 0 2021 3 30 ...

Страница 2: ... this document complete accurate and up to date However GoodWe may need to make some improvements under certain circumstances without advance notice GoodWe shall not be responsible for any loss caused by this document including but not limited to omissions errors typographical errors arithmetical errors or listing errors in this document Disclaimer Version Date Record V1 0 2021 3 30 First Release ...

Страница 3: ...Floor Mounting Space Requirements 6 5 2 2 Wall Mounting Space Requirements 7 5 3 System Installation 8 5 3 1 Package Removing 8 5 3 2 Floor Mounting 9 5 3 3 Wall Mounting 9 5 3 4 Cable Connection 10 5 3 5 Install the Wire Harness Fix Bar 14 06 System Operation 15 6 1 Check Before Power On 15 6 2 Power On 15 6 3 Battery Parameter Settings 15 6 4 Indicator Status 16 6 4 1 Normal State 16 6 4 2 Alert...

Страница 4: ...inguisher or Novac1230 or FM 200 is nearby The fire cannot be put out by water ABC does not work for battery fire fighting Firefighters are required to wear full protective clothing and self contained breathing apparatus when fighting fires The battery may explode when the ambient temperature exceeds 150 Please use appropriate tools and take protective measures when installing and maintaining heav...

Страница 5: ...tective equipment during operation High voltage danger Power off the equipment before any operations Operate the equipment properly to avoid explosion danger The battery contains corrosive electrolytes Please avoid contact with leaked liquid or gas Refer to all manuals before any operations Pay attention to safety protection during installation operation and maintenance Keep the battery away from ...

Страница 6: ...the battery 3 Button Indicator Green and red light indicates the battery state together with the SOC indicator 4 Grounding Teminal Grounding Protection 5 Negative Pole of the Battery Power transmission 6 Positive Pole of the Battery Power transmission 7 CAN COM Port Communication transmission 8 Circuit Breaker Short circuit break protection 3 1 Appearance 1 2 3 4 4 5 6 6 5 7 7 8 ...

Страница 7: ...4 3 2 Dimensions 570mm 285mm 505mm 124mm 124mm 175mm Wall Mounting Plate Front View Side View ...

Страница 8: ...nsation is found Place the quipment in a cool place where away from direct sunlight Keep the equipment away from inflammable explosive and corrosive matters Keep the equipment away from the rain Check outer packing for damage and model before unpacking it If you find any damage or the model is not what you requested do not unpack the product and contact the after sales service as soon as possible ...

Страница 9: ...Install the equipment away from heat cold source Do not install the equipment in the place where the temperature changes extremely Install the equipment away from strong interferences to ensure its regular work Keep children away from the equipment Do not install the equipment in places prone to accumulate water Do not put inflammable or explosive matters near the equipment 5 2 1 Floor Mounting Sp...

Страница 10: ...ecommened distance Keep the distance as short as you can if there is no influence to the operation Single Row Installation Double Row Installation 300 500mm 300mm 500mm BAT 1 BAT 2 BAT 6 500mm 300mm 1500mm 200mm 300mm 500mm 300mm 500mm 300 500mm 300 500mm BAT 1 BAT 2 BAT 4 BAT 5 BAT 6 BAT 3 1500mm ...

Страница 11: ...emove it 3 Take out the wall mounting plate 4 Hold the battery handle to take the battery out 5 3 1 Package Removing If multi batteries are to be connected check and select batteries with similar production date Strictly follow the warnings on the outer package which shows you the right direction for placing ...

Страница 12: ... depth 80mm 4 Fix the expansion bolts tightening torque 10N m 5 3 3 Wall Mounting 1 Mark the drilling position using the wall mounting plate and level using a spirit level 2 Place the wall mounting plate close to the wall firmly mark the drilling position and remove the wall mounting plate 3 Drill a hole on the wall using the driller Hole diameter 13mm and depth 65mm 4 Fix the M10 expansion bolts ...

Страница 13: ... of the battery to the slot Overview of the cable connection 1 2 Ground Cable Standard Net Cable Power Cable for Negative Pole Power Cable for Positive Pole Take SBP series as an example here COM PORT COM PORT COM PORT COM PORT Terminal Resistance Battery 1 Battery 2 Battery 6 Wi Fi Reset Reload SYSTEM GRID BACK UP ENERGY COM Wi Fi BATTERY FAULT 2 0 1 9 ...

Страница 14: ...equipment Disconnect the PE cable before dismantling the equipment The drawing force of the cables after crimping is at least 400N Connect any one of the two ground cables to the ground Reserve the other ground cable The cross sectional area of the PE cable conductor 5mm2 The cable should meet standards for outdoor use 2 N M M5 L2 L1 1 2 mm L2 L1 ...

Страница 15: ...ulic press plier mould 25mm Drawing force after crimping 1200N If a single battery is applied you are suggested to connect any one of the two power ports and cover the other port using the protective cover Connect power cables between multi batteries in parallel which means connect postive pole of one battery to the positive pole of the next battery and negative pole to negative pole Cover and pro...

Страница 16: ...ctor and connect the other cable to the terminal resistance When multiple batteries are applied connect the communication ports in series using net cables Connect one communication cable of the last battery to the terminal resistance RJ45 Registered Jack CAN COM Port PIN Definition 4 CAN_H 5 CAN_L 1 2 3 6 7 8 N A 2 Route the cable through the waterproof module 3 Crimp the RJ45 Registered Jack 4 Se...

Страница 17: ...he communication cable and the terminal resistance to the battery 6 Secure the cover 1 Put the wire harness on the corresponding slot 2 Install the bar using M5 screws 5 3 5 Install the Wire Harness Fix Bar 2 N M M5 ...

Страница 18: ...4 L 1 LX U5 4 L 2 LX U5 4 L 3 LX U5 4 L 4 LX U5 4 L 5 LX U5 4 L 6 6 1 Check Before Power On No Items 1 The equipment is installed firmly in a place where is convenient for operation and maintenance The installation place is clean and well ventilated 2 The ground cable power cable communication cable and terminal resistance are connected correctly and securely 3 The cable ties meet the cabling requ...

Страница 19: ...een Light Standby Working Alert Red Light Faulty Button Indicator SOC Indicator Description Standby green light blinking for 1s Working green light on SOC 5 5 SOC 25 25 SOC 50 50 SOC 75 75 SOC 95 SOC 95 SOC Indicator Button Indicator 6 4 1 Normal State ...

Страница 20: ...ies are connected just press the button of any one battery consecutively for 5 times to activate them Button Indicator SOC Indicator Fault Solution Red light blinking for 3s Temp sensor failure Restart the battery If the problem persists please contact GoodWe for help MOS Failure Circuit Breaker Failure Turn on the Circuit Breaker If the problem persists please contact GoodWe Slaver Control Commun...

Страница 21: ...he button of any one battey if multi batteries are connected 2 Turn off the Circuit Breaker 3 Make sure that the SOC indicator of the battery is off 6 5 Power Off Ensure that the battery can work normally before installing the cover Do not press the cables during installation 1 Install the plastic cover 2 Push the snap of the cover into the slot 6 6 Install the Plastic Cover ...

Страница 22: ...N Weight Kg 57 Kg 114 Kg 171 Kg 228 Kg 285 Kg 342 Kg Dimensions W D H mm 505 175 570 mm LX U5 4 L Operating Temperature Charge 0 T 50 Discharge 10 T 50 Storage temperature 20 40 One Month 0 35 One Year Humidity 95 Altitude m 2000m Protection Degree IP65 Outdoor Indoor Installation Location Wall Mounted Ground Mounted Standard and Certification Safety IEC62619 CEC EMC CE RCM Transportation UN38 3 R...

Страница 23: ...to avoid affecting heat dissipation Once Every 6 months Check for water and pest to avoid prolonged intrusion Once Every 6 months Please contact after sales for help if you find any problems that may influence the battery or the inverter Disassemble without permission is strictly forbidden Please contact after sales for help if the conductive wire is exposed because high voltage danger exists Do n...

Страница 24: ...WE POWER SUPPLY TECHNOLOGY CO LTD No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com PV Master APP SEMS Portal APP SEMS Portal website www semsportal com LinkedIn GoodWe Offical Website ...

Отзывы: