background image

GDS-15-PH 0519

15

7.

   When you see chemical exiting 

Valve #3

 into the hose, slide the 

pH Controller 

Switch

 to “OFF”.

8.

 The 

Chemical Pump

 is primed.

Priming the Main Pump - Closed Vessel Descaling

1.

  Close all the valves on the unit (

Valves #1, #2, and #3

).

2.

   Remove the top of the 

Venting Drum

 and fill halfway with water or 

ScaleBreak®

 

(about 8 gallons, 30 L).

3.

   Connect a recirculation hose to 

Valve #3 

(Pump Output Valve) and to the input 

of the vessel being cleaned.

4.

   Connect the other recirculation hose to the venting drum and to the output of 

the vessel being cleaned.

5.

 Open 

Valve #1

 (Venting Drum Valve) and 

Valve #3

 (Pump Output Valve)

6.

  Make sure the valves on both recirculation hoses are open.

7.

   Water/descaling solution will flow from the 

Venting Drum

 to the pump and 

flood the input of the pump.

8.

  

IMPORTANT:

 Make sure that the water level in the 

Venting Drum

 is always 

above the elbow at the bottom of the 

Overfill Level Sensor

 (about 5  

gallons, 19 L minimum).

9.

  Replace the lid on the 

Venting Drum

.

10.

  Main pump is primed.

11.

   230V version only - If this doesn't work on the 230V version, the unit will have 

to be forced prime. This is done by connecting the chemical pickup hose to a 

water supply, and having it force fluids into the pump.

IMPORTANT: Valve #1 (Venting Drum Valve) must be OPEN for proper operation with 

a closed vessel-type system.
Priming the Main Pump - Open Vessel (Bath) Descaling:

1.

  Close all the valves on the unit (

Valves #1, #2, and #3

).

2.

   Remove the top of the 

Venting Drum

 and fill halfway with water or

 ScaleBreak®

 

(about 8 gallons, 30 L).

3.

  Connect a hose to 

Valve #2

 (Pump Input Valve). Make sure hose valve is closed.

4.

 Open 

Valve #1

 (Venting Drum Valve) and Valve #2 (Pump Input Valve).

5.

   Open the valve on the hose. When water/descaling solution exits the hose, 

close the hose valve.

6.

  

IMPORTANT:

 The hose connected to 

Valve #2

 (Pump Input Valve) must be full 

of water for proper operation!!!

7.

   Connect a hose to 

Valve #3

 (Pump Output Valve). Make sure hose valve  

is closed.

8.

 Open

 Valve #3

 (Pump Output Valve).

9.

  Open the valve on the hose. When water exits the hose, close the hose valve.

10.

 Close 

Valve #1

 (Venting Drum Valve).

11.

  Place both hose valves into the open vessel (bath).

12.

  Open both valves while the valves are submerged.

13.

  

IMPORTANT:

 Both Hose Valves must always be submerged for  

proper operation.

14.

  Replace the lid on the 

Venting Drum

.

15.

  Main pump is primed.

IMPORTANT: Valve #1 (Venting Drum Valve) must be CLOSED for proper operation 

with an open vessel bath-type system.

Содержание GDS-15-PH

Страница 1: ...GDS 15 PH Goodway Descaling System With Automatic Ph Control Operating and Maintenance Instructions Read before operating...

Страница 2: ...Descaling Solution 18 Shutting Down 18 pH Sensor Storage 19 General Maintenance and Storage 19 Quick Start Guide 20 Accessories Spare Parts 21 Troubleshooting 22 Specifications 22 23 Wiring Diagram GD...

Страница 3: ...t 5 Keep bystanders children and visitors away while operating this unit 6 Turn unit off and relieve pressure in the hoses when done 7 Do not use while tired or under the influence of drugs alcohol or...

Страница 4: ...ilure close all ball valves on the unit to prevent backflow and chemical overflow of the unit CAUTION If you are unsure about chemical compatability call Goodway at once Using a non compatable chemica...

Страница 5: ...ands after using WARNING do not dump low ph solution less than 5 0 into sink or drain disposal must be according to local state and federal laws Warranty Information Please check the included warranty...

Страница 6: ...with one 1 GDS 15 PH unit two 2 15 4 5 m hoses with shut off valves one 1 pH Sensor Storage Solution bottle and one 1 box of pH Calibration packets Venting Drum 15 foot 4 5 m Hose with Shut Off Valve...

Страница 7: ...R SWITCH controls the main recirculation pump This switch must be in the ON position up for normal recirculation operation Circuit Breaker The CIRCUIT BREAKER is a fast acting resettable 15 amp circui...

Страница 8: ...s pH CONTROLLER DS 03 The pH Controller is the brains of the GDS 15 PH It monitors the pH of the descaling solution and injects chemical whenever the pH rises above the setpoint The pH Controller can...

Страница 9: ...GDS 15 PH 0519 9 Valve 1 Drum Valve Valve 2 Pump Input Valve Valve 3 Pump Output Valve PLUMBING CONNECTIONS Venting Drum Connection Power Cord Chemical Pickup Hose Control Valves...

Страница 10: ...requirements for ScaleBreak injection into units logistics on hose connections on inlet and return points 6 ScaleBreak general injection process understanding and logistics 7 CO2 gas escape venting re...

Страница 11: ...king temperatures if heat is to be applied It may be necessary to remove selected system components if the cleaning process might damage them The entire cleaning procedure process must be developed in...

Страница 12: ...wdriver into the CAL opening on the pH Controller and turn until the reading is correct If you cannot calibrate the sensor it may be damaged Call Goodway for more information To Check the Calibration...

Страница 13: ...sure the unit is plugged in and the GFCI is reset 4 Press the SET button on the pH Controller 5 Insert a small screwdriver in the SET opening 6 Turn the screwdriver clockwise for a higher pH Setpoint...

Страница 14: ...he appropriate catch basin 4 PRIME THE CHEMICAL PUMP AND MAIN PUMP The Chemical Pump and Main Pump MUST be primed for proper operation If not properly primed the descaling solution will not circulate...

Страница 15: ...y connecting the chemical pickup hose to a water supply and having it force fluids into the pump IMPORTANT Valve 1 Venting Drum Valve must be OPEN for proper operation with a closed vessel type system...

Страница 16: ...rum and clean the unit using the Auto mode on the pH Controller a Make sure the Venting Drum is only full up to the elbow of the Overfill Sensor This will allow the maximum amount of ScaleBreak to be...

Страница 17: ...ions to vent any fumes from the descaling operation and to provide extra volume for the chemical injected into the system To prevent the overfilling of the Venting Drum if too much chemical is added t...

Страница 18: ...eactions will cause severe foaming and overflow the venting drum SHUTTING DOWN Once the descaling solution is neutralized 1 Close the valves on the hoses 2 Disconnect the hoses from the vessel Leave t...

Страница 19: ...ry to maximize performance and longevity Protect unit from freezing temperatures Do not store unit outdoors To protect the unit from damage the plumbing pumps and hoses should be drained before the un...

Страница 20: ...itch to AUTO 12 If red OVERFILL ALARM lamp is lit Venting Drum is full on GDS 15 PH chemical pump will be disabled Drain some solution into a suitable container to continue page 13 13 After one hour o...

Страница 21: ...nsor Storage Solution DS 04 3 pH Calibration Packets DS 04 CAP pH Sensor Tip Cap DS SENSOR CAP pH Sensor Cam and Groove Cap Scalebreak 5 ScaleBreak Descaling Solution 5 Gallon Bucket Scalebreak 30 Sca...

Страница 22: ...LL ALARM Thermal breaker tripped motor overheated Chemical pump fuse is blown pH Rises Above Setpoint During Cleaning Chemical supply is empty Chemical Pump is not working see above pH Sensor is damag...

Страница 23: ...f priming Temperature N A Noise Level N A Voltage Hz 110 120 Volts AC 60 Hz Amps 10 75 Amps 120 Volts Watts 1240 Watts Voltage Hz 220 240 Volts AC 50 60 Hz Amps 5 38 Amps 240 Volts Watts 1240 Watts Ho...

Страница 24: ...GDS 15 PH 0519 24 WIRING DIAGRAM GDS 15 PH 120 VOLT...

Страница 25: ...GDS 15 PH 0519 25 WIRING DIAGRAM GDS 15 PH 240 VOLT...

Страница 26: ...GDS 15 PH 0519 26 PLUMBING DIAGRAM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17...

Страница 27: ...e 3 4 6220 3 1 Hose Barb 1 5 DS 26 6 lg Nipple 1 6 DS 34 Check Valve 1 7 DS 25 3 lg Nipple 1 8 DS 22 Tee 2 9 DS 27 12 lg Nipple 3 10 DS 29 FxF Elbow 4 11 DS 26 6 lg Nipple 3 12 DS 30 MxF Elbow 1 13 DS...

Страница 28: ...rp Stamford CT USA Effective date May 24 2019 Goodway is a Trademark of Crossford International Goodway reserves the right to improve products contact the factory for the latest configuration and uses...

Отзывы: