Goodman CHJD Series Скачать руководство пользователя страница 3

835961-UIM-B-0412

Johnson Controls Unitary Products

3

GROUND INSTALLATION

The unit may be installed at ground level on a solid base that will not
shift or settle, causing strain on the refrigerant lines and possible leaks.
Maintain the clearances shown in Figure 1 and install the unit in a level
position.

Normal operating sound levels may be objectionable if the unit is placed
directly under windows of certain rooms (bedrooms, study, etc.).

Condensate will drain from beneath the coil of the outdoor unit during
the defrost cycle. Normally this condensate may be allowed to drain
directly on the ground.

Elevate the unit sufficiently to prevent any blockage of the air entrances
by snow in areas where there will be snow accumulation. Check the
local weather bureau for the expected snow accumulation in your area.

Isolate the unit from rain gutters to avoid any possible wash out of the
foundation.

ROOF INSTALLATION

When installing units on a roof, the structure must be capable of sup-
porting the total weight of the unit, including a pad, lintels, rails, etc.,
which should be used to minimize the transmission of sound or vibra-
tion into the conditioned space.

UNIT PLACEMENT

1.

Provide a base in the pre-determined location.

2.

Remove the shipping carton and inspect for possible damage.

3.

Compressor tie-down bolts should remain tightened.

4.

Position the unit on the base provided.

LIQUID LINE FILTER-DRIER

The heat pumps have a solid core bi-flow filter/drier located on the liquid
line.

*As listed on the “Energy Guide yellow sticker on the unit.

PIPING CONNECTIONS

The outdoor unit must be connected to the indoor coil using field sup-
plied refrigerant grade copper tubing that is internally clean and dry.
Units should be installed only with the tubing sizes for approved system
combinations as specified in Tabular Data Sheet. The charge given is
applicable for total tubing lengths up to 15 feet. See Application Data
Part Number 247077 for installing tubing of longer lengths and elevation
differences.

PRECAUTIONS DURING LINE INSTALLATION

1.

Install the lines with as few bends as possible. Care must be taken
not to damage the couplings or kink the tubing. Use clean hard
drawn copper tubing where no appreciable amount of bending
around obstruction is necessary. If soft copper must be used, care
must be taken to avoid sharp bends which may cause a restriction.

2.

The lines should be installed so that they will not obstruct service
access to the coil, air handling system, or filter.

3.

Care must also be taken to isolate the refrigerant lines to minimize
noise transmission from the equipment to the structure.

4.

The vapor line must be insulated with a minimum of 1/2" foam rub-
ber insulation (Armaflex or equivalent). Liquid lines that will be
exposed to direct sunlight and/or high temperatures must also be
insulated.

5.

Tape and suspend the refrigerant lines as shown. DO NOT allow
tube metal-to-metal contact. See Figure 2.

6.

Use PVC piping as a conduit for all underground installations as
shown in Figure 3. Buried lines should be kept as short as possible
to minimize the build up of liquid refrigerant in the vapor line during
long periods of shutdown.

7.

Pack fiberglass insulation and a sealing material such as perma-
gum around refrigerant lines where they penetrate a wall to reduce
vibration and to retain some flexibility.

8.

See Form 247077 for additional piping information.

The outdoor unit should not be installed in an area where mud or
ice could cause personal injury. Remember that condensate will
drip from the unit coil during heat and defrost cycles and that this
condensate will freeze when the temperature of the outdoor air is
below 32°F.

Heat pumps will defrost periodically resulting in water drainage. The
unit should not be located where water drainage may freeze and
create a hazardous condition - such as sidewalks and steps.

Replacements for the liquid line drier must be exactly the same as
marked on the original factory drier. See Source 1 for O.E.M.
replacement driers.

Failure to do so or using a substitute drier or a granular type may
result in damage to the equipment.

Filter-Drier

Source 1 Part No.

Apply with Models

S1-52636219000

All

NOTICE

NOTICE

Using a larger than specified line size could result in oil return prob-
lems. Using too small a line will result in loss of capacity and other
problems caused by insufficient refrigerant flow. Slope horizontal
vapor lines at least 1" every 20 feet toward the outdoor unit to facili-
tate proper oil return.

 FIGURE 2:  

Tubing Hanger

 FIGURE 3:  

Underground Installation

NOTICE

Liquid
Line

Incorrect

Correct

Tape

Sheet Metal Hanger

Insulated Vapor Line

TO INDOOR COIL

TO O UTDOOR UNIT

LIQUID LINE

CAP

PVC

CONDUIT

INSULATED

VAPOR LINE

Содержание CHJD Series

Страница 1: ...may need to be changed for some indoor out door unit combinations elevation differences or total line lengths Refer to Application Data covering General Piping Recommendations and Refrigerant Line Length Part Number 247077 SECTION II SAFETY This is a safety alert symbol When you see this symbol on labels or in manuals be alert to the potential for personal injury Understand and pay particular atte...

Страница 2: ...erformed in order to insure proper system operation and performance Line set change out is also recommended 1 Change out of the indoor coil to an approved R 410A coil con densing unit combination with the appropriate metering device 2 Change out of the line set when replacing an R 22 unit with an R410 A unit is highly recommended to reduce cross contamina tion of oils and refrigerants 3 If change ...

Страница 3: ...s necessary If soft copper must be used care must be taken to avoid sharp bends which may cause a restriction 2 The lines should be installed so that they will not obstruct service access to the coil air handling system or filter 3 Care must also be taken to isolate the refrigerant lines to minimize noise transmission from the equipment to the structure 4 The vapor line must be insulated with a mi...

Страница 4: ...rigerant piping connections including the service port flare caps to be sure they are leak tight DO NOT OVER TIGHTEN between 40 and 60 inch lbs maximum 9 Evacuate the vapor line evaporator and the liquid line to 500 microns or less 10 Replace cap on service ports Do not remove the flare caps from the service ports except when necessary for servicing the system 11 Release the refrigerant charge int...

Страница 5: ...por line as follows a Hand tighten the 1 4 SAE nut to the Schrader fitting and an additional 1 3 turn to seal 7 Install the TXV bulb to the vapor line near the equalizer line using the bulb clamp s furnished with the TXV assembly Ensure the bulb is making maximum contact a Bulb should be installed on a horizontal run of the vapor line if possible On lines under 7 8 O D the bulb may be installed on...

Страница 6: ...fic charging charts are provided on the access panel of the unit SECTION VIII ELECTRICAL CONNECTIONS GENERAL INFORMATION GROUNDING Check the electrical supply to be sure that it meets the values specified on the unit nameplate and wiring label Power wiring control low voltage wiring disconnect switches and over current protection must be supplied by the installer Wire size should be sized per NEC ...

Страница 7: ...late Contactor Dual Run Fan Capacitor Fan Relay Defrost Control Board Ground Lug Fingered Bushing Low Voltage Box Reversible High Voltage Conduit Plate Contactor Fan Capacitor To eliminate erratic operation seal the hole in the wall at the ther mostat with permagum or equivalent to prevent air drafts affecting the operation of in the thermostat A Start Assist Kit is available and recommended for l...

Страница 8: ...KCASE HEATER If this unit is equipped with a crankcase heater for the compressor a warning label with an adhesive back is supplied in the unit installation instruction packet This label should be attached to the field supplied disconnect switch where it will be easily seen In order to energize the crankcase heater set the indoor cooling ther mostat to the OFF position Close the line power disconne...

Страница 9: ...58 164 73 211 88 266 103 331 118 407 59 167 74 214 89 270 104 336 119 412 FIGURE 10 Heat Pump Flow Diagram CHARGE COMPENSATOR Empty in cooling full in heating Not included in all Units FIELD CONNECTED LINE INDOOR COIL OUTDOOR COIL 4 WAY REVERSING VALVE FILTER DRYER Solid core SUCTION ACCUMULATOR LIQUID SENSOR COMPRESSOR BI FLOW TXV CHECK VALVE Cooling BI FLOW TXV CHECK VALVE OR ORIFICE Heating FIG...

Страница 10: ...d the first stage of heat is turned on through W1 66 to continue warming the conditioned space The defrost cycle will be terminated when the defrost thermostat is opened at 55 F or 10 minutes of compressor accumulated run time whichever comes first Demand Defrost 13 Seer 1 5 ton 14 5 Seer 1 5 4 Ton The control maintains proper airflow through the outdoor coil during heating operation by melting fr...

Страница 11: ...be bypassed and the compressor and the W1 66 terminal to auxiliary heat will be energized When the TEST inputs are used to force a defrost cycle the control will ignore the state of the liquid line temperature and outdoor ambient tem perature inputs The coil does not have to be cold and the outdoor tem perature does not have to be within a certain range for the heat pump to be forced into a defros...

Страница 12: ...de energize the compres sor and energize the X L output with the appropriate flash code The control will reset the soft lockout condition when any of the follow ing occur following removal of the fault condition 1 Power is cycled to the R or Y inputs of the control This will cause the soft lockout condition to be reset when the thermostat is satis fied or when the thermostat is set to SYSTEM OFF a...

Страница 13: ...835961 UIM B 0412 Johnson Controls Unitary Products 13 SECTION VII WIRING DIAGRAM FIGURE 14 Wiring Diagram Single Phase Demand Defrost ...

Страница 14: ...ANGE PNK PINK PUR PURPLE RED RED WHT WHITE YEL YELLOW BLK BLK BRN PNK YEL PNK HPS HTS LPS BRN PNK YEL PNK YEL PNK SEE UNIT INSTALLATION INSTRUCTIONS FOR LOW VOLTAGE TERMINATIONS COND FAN X L PUR RED DEFROST CONTROL BLK WHT BRN BLK REV VALVE YEL ORG RV R C Y O W W1 66 PRES SWITCH DFST T STAT M BRN PNK YEL PNK BLK GRY LS BLU DANGER SHOCK HAZARD TURN OFF ELECTRICAL POWER BEFORE SERVICING TO PREVENT P...

Страница 15: ...835961 UIM B 0412 Johnson Controls Unitary Products 15 FIGURE 16 Wiring Diagram Three Phase Demand Defrost 407154 ...

Страница 16: ...LK ORG ORG B L K 4 6 0 V BLK 460V B L K 4 6 0 V BLK 460V RED BRN WHT BLK 208 230 BLK 208 230 BRN PNK YEL PNK HPS HTS LPS BRN PNK YEL PNK YEL PNK SEE UNIT INSTALLATION INSTRUCTIONS FOR LOW VOLTAGE TERMINATIONS COND FAN X L PUR RED DEFROST CONTROL BLK WHT BRN BLK REV VALVE YEL ORG RV R C Y O W W1 66 PRESS SWITCH DFST T STAT M BRN PNK GRY BLK YEL 460V BLK 460V LS BLU DANGER SHOCK HAZARD TURN OFF ELEC...

Отзывы: