1.

Close the manual gas shutoff valve external to the furnace.

2.

Turn off the electrical power to the furnace.

3.

Set the room thermostat to the lowest possible setting.

4.

Remove the burner compartment door.

NOTE:

  This furnace is equipped with an ignition device which

automatically lights the burner.  Do not try to light the burner by
hand.

5. Move the furnace gas valve manual control to the OFF

position.

6. Wait five minutes then smell for gas. Be sure check near

the floor as some types of gas are heavier than air.

7. If you smell gas after five minutes, immediately follow the

instructions on page 5 of this manual.  If you do not smell
gas after five minutes,  move the furnace gas valve manual
control to the ON position.

8.

Replace the burner compartment door.

9.

Open the manual gas shutoff valve external to the furnace.

10. Turn on the electrical power to the furnace.

11. Adjust the thermostat to a setting above room temperature.

12. After the burners are lit, set the thermostat to desired

temperature.

NOTE:

 There is an approximate 30 second delay between

thermostat energizing and burner firing.

F

URNACE

 S

HUTDOWN

1. Set the thermostat to lowest setting.

2. Turn off the electrical power supply to the furnace.

3. Remove the burner compartment door and move the furnace

gas valve manual control to the OFF position.

4. Close manual gas shutoff valve external to the furnace.

5. Replace the burner compartment door.

High Manifold

Regulator Adjustment

Screw (Under Cap)

Inlet Pressure Tap

(Side of Valve)

Low Manifold

Regulator Adjustment

Screw (Under Cap)

Outlet  (Manifold) 

Pressure Tap

(Side of Valve)

Gas Valve
Manual Control

Manometer

Open to 
Atmosphere

Manometer

Hose

White-Rodgers Model 36E54 Connected to Manometer

G

AS

 S

UPPLY

 P

RESSURE

 M

EASUREMENT

o

p

e

r

a

t

i

n

g

.

CAUTION

T

O PREVENT UNRELIABLE OPERATION OR EQUIPMENT DAMAGE, THE INLET

GAS SUPPLY PRESSURE MUST BE AS SPECIFIED ON THE UNIT RATING PLATE

WITH  ALL OTHER HOUSEHOLD  GAS FIRED APPLIANCES OPERATING.

The line pressure supplied to the gas valve must be within the
range specified below.  The supply pressure can be measured at
the gas valve inlet pressure tap or at a hose fitting installed in the

• Integrated control module performs safety circuit checks.
• Outdoor fan and compressor are energized to their

appropriate speed.

• Circulator blower is energized on the appropriate cool speed

following a fixed five second on delay.  The circulator blower
requires 30 seconds to ramp up to full speed.  Electronic air
cleaner terminals are energized with circulator blower.

• Furnace circulator blower and outdoor cooling unit run their

appropriate speed, integrated control module monitors
safety circuits continuously.

• R and YLO/G or Y/G thermostat contacts open, completing

the call for cool.

• Outdoor fan and compressor are de-energized.
• Circulator blower continues running for a cool off delay

period.  The OFF delay time and airflow level are determined
by the selected ramping profile.

• Electronic air cleaner terminals and circulator blower are

de-energized.

• Furnace awaits next call from thermostat.

C

ONSTANT

 F

AN

• R and G thermostat contacts close, initiating a call for fan.
• Integrated control module performs safety circuit checks.
• Circulator blower is energized on continuous fan speed (56%

of high stage cooling) following a five (5) second delay.
Electronic air cleaner terminals are energized.

• Circulator blower runs, integrated control module monitors

safety circuits continuously.

• R and G thermostat contacts open, completing the call for

fan.

• Circulator blower is de-energized.  Electronic air cleaner

terminals are de-energized.

• Furnace awaits next call from thermostat.

XII. START-UP PROCEDURE AND ADJUSTMENT

Furnace must have a 115 VAC power supply properly connected
and grounded.  Proper polarity must be maintained for correct
operation.  An interlock switch prevents furnace operation if the
blower door is not in place.  Keep the blower access door in place
except for inspection and maintenance.

This furnace is also equipped with a self-diagnosing electronic
control module. In the event a furnace component is not operating
properly, the control module LED  will  flash on and off in a factory-
programmed sequence, depending on the problem encountered.
This light can be viewed through the observation window in the
blower access door.  Refer to the 

Troubleshooting Chart

 for further

explanation of the lighting codes.

Follow the start-up and adjustment items, refer to further information
in 

Section XIII, Operational Checks

.

F

URNACE

 

OPERATION

Purge gas lines of air prior to start-up.  Do not purge lines into an
enclosed burner compartment.

Check for leaks using an approved chloride-free soap and water
solution, an electronic combustible gas detector, or other approved
method.  Verify that all required kits (propane gas, high altitude,
etc.) have been appropriately installed.

NOTE:  

An interlock switch prevents furnace operation if the blower

door is not in place.  Keep the blower access doors in place except
for inspection and maintenance.

F

URNACE

 S

TART

-

UP

Содержание AMV8

Страница 1: ...than when the unit is in operation Remember it is your responsibility to install the product safely and to know it well enough to be able to instruct a customer in its safe use Safety is a matter of...

Страница 2: ...INSTALLATION 13 FIX 1 LINER TERMINATION 13 FIX 2 CHANGE VENTING ARRANGEMENTS 13 FIX 3 REBUILD THE CROWN 13 FIX 4 RELINING 13 VIII Electrical Connections 14 WIRING HARNESS 14 115 VOLT LINE CONNECTIONS...

Страница 3: ...7 ANNUAL INSPECTION 27 FILTERS 27 FILTER MAINTENANCE 27 FILTER REMOVAL 27 UPRIGHT FILTER REMOVAL 27 INDUCED DRAFT AND CIRCULATOR BLOWER MOTORS 28 FLAME SENSOR QUALIFIED SERVICER ONLY 28 IGNITER QUALIF...

Страница 4: ...mponent failures could result in heating system operational problems TO THE INSTALLER Before installing this unit please read this manual thoroughly to familiarize yourself with specific items which m...

Страница 5: ...uring grounding will be discharged 3 Service integrated control module or connecting wiring following the discharge process in step 2 Use caution not to recharge your body with static electricity i e...

Страница 6: ...s permitted when installed in the horizontal configuration Line contact is defined as the portion of the cabinet that is formed by the intersection of the top and side National Fire Protection Associa...

Страница 7: ...nting system are not in operation a Seal any unused openings in the venting system b Inspect the venting system for proper size and horizontal pitch as required by the National Fuel Gas Code ANSI Z223...

Страница 8: ...AM AGE PERSONAL INJURY OR DEATH SUFFICIENT FRESH AIR FO R PROPER COM BUSTION AND VENTILATION OF FLUE G ASES M UST BE SUPPLIED MO ST HOM ES REQ UIRE OUTSIDE AIR BE SUPPLIED INTO THE FURNACE AREA Improv...

Страница 9: ...input rating of all equipment in the enclosure Furnace Water Heater Chimney or Gas Vent NOTE The air duct openings must have a free area of not less than one square inch per 2000 BTU of the total inp...

Страница 10: ...W 70 4 Inch 90 4 Inch 115 N A 140 N A MODEL Under some conditions larger vents than those shown above may be required or allowed When an existing furnace is removed from a venting system serving other...

Страница 11: ...ter Water Heater Vent Connector Basement Floor F A F Vent Connector Figure 8 Typical Multiple Flue Clay Tile Chimney CHECKLIST SUMMARY This checklist serves as a summary of the items to be checked bef...

Страница 12: ...must be removed and replaced Fix 4 Next gently tap the inside of the liner with a Phillips screwdriver If the screwdriver perforates the liner or if the tapping does not sound like metal hitting metal...

Страница 13: ...acturer s instructions In some cases a shorter extension above the roof may be possible with a liner than would be required with a masonry chimney For further information on relining see Fix 4 FIX 2 C...

Страница 14: ...s that have the junction box located in the include indoor swimming pools and chlorine bleaches paint strippers adhesives paints varnishes sealers waxes which are not yet dried and solvents used durin...

Страница 15: ...switch 24 VOLT THERMOSTAT WIRING NOTE Wire routing must not interfere with circulator blower operation filter removal or routine maintenance As a two stage furnace the furnace integrated control modul...

Страница 16: ...furnace integrated control module 4 Secure the dehumidistat ground wire typically the green lead to the ground screw on the furnace junction box NOTE Ground wire may not be present on all dehumidista...

Страница 17: ...own on the rating plate Overfiring of the furnace can result in premature heat exchanger failure Gas pressures in excess of 13 inches water column can also cause permanent damage to the gas valve IMPO...

Страница 18: ...pressure switch kits PROPANE GAS CONVERSION WARNING POSSIBLE PROPERTY DAMAGE PERSONAL INJURY OR DEATH MAY OCCUR IF THE CORRECT CONVERSION KITS ARE NOT INSTALLED THE APPROPRIATE KITS MUST BE APPLIED TO...

Страница 19: ...h the left side of the furnace the installer must supply the following fittings starting from the gas valve Straight pipe to reach the exterior of the furnace A ground joint union drip leg and manual...

Страница 20: ...9 1 559 50 18 37 79 131 198 376 114 237 448 913 1 417 60 16 35 72 121 187 340 103 217 409 834 1 275 80 13 29 62 104 155 289 89 185 346 724 1 066 100 11 26 55 90 138 255 78 162 307 630 976 125 10 24 48...

Страница 21: ...waits call from thermostat NORMAL HEATING SEQUENCE R and W1 or R and W1 W2 thermostat contacts close initiating a call for heat Integrated control module performs safety circuit checks Induced draft b...

Страница 22: ...blower requires 30 seconds to ramp up to full speed Electronic air cleaner terminals are energized with circulator blower Furnace circulator blower and outdoor cooling unit run their appropriate spee...

Страница 23: ...Installation s gas heating HTG value 1 000 BTU ft3 Obtained from gas supplier Installation s seconds per cubic foot 34 sec ft3 Conversion Factor hours to seconds 3600 sec hr Input Htg value x 3600 sec...

Страница 24: ...r the cooling system Most cooling systems are designed to work with air flows between 350 and 450 CFM per ton Most manufacturers recommend an air flow of about 400 CFM per ton Example 2 5 tons X 400 C...

Страница 25: ...ormance to be optimized for the particular homeowner s needs O F F O F F 8 7 4 3 2 1 O F F O N 4 3 2 1 O N O F F 4 3 2 1 O N O N 4 3 2 1 Cooling Speed Tap A Cooling Speed Tap B Cooling Speed Tap C Coo...

Страница 26: ...ontrol will reset and allow the furnace to resume normal operation WARNING TO PREVENT PREMATURE FAILURE OF HEAT EXCHANGER PROPERTY DAMAGE PERSONAL INJURY OR DEATH DO NOT ADJUST THE LIMIT CONTROL FACTO...

Страница 27: ...n determining the cause XVI MAINTENANCE WARNING TO AVOID ELECTRICAL SHOCK INJURY OR DEATH DISCONNECT ELECTRICAL POWER BEFORE PERFORMING ANY MAINTENANCE IF YOU MUST HANDLE THE IGNITER HANDLE WITH CARE...

Страница 28: ...VENT PERSONAL INJURY OR DEATH DO NOT REMOVE ANY INTERNAL COMPARTMENT COVERS OR ATTEMPT ANY ADJUSTMENT ELECTRICAL COMPONENTS ARE CONTAINED IN BOTH COMPARTMENTS CONTACT A QUALIFIED SERVICE AGENT AT ONCE...

Страница 29: ...circuit Inspect pressure switch hose Repair if necessary Inspect flue for blockage proper length elbows and termination Correct pressure switch setpoint or contact motion Tighten or correct wiring con...

Страница 30: ...spect for proper sensor alignment Check inlet air piping for blockage proper length elbows and termination Compare current gas pressure to rating plate info Adjust as needed Turn power OFF prior to re...

Страница 31: ...MIT CONTROL WIRING TO UNIT MUST BE PROPERLY ON S OME M O DE LS IN DU CTO R COI L P R ES SU R E SWI TC H LO W FIR E Y L RD BK WH IN D U CED B R GN D WH WH BK BR RD GN BU BR WH AU XI LIA RY LI M I T C O...

Страница 32: ...of product failure They are simple to service and forgiving to operate We use quality materials and components Finally every unit is run tested before it leaves the factory That s why we know There s...