![Goodman AMES960403BU AA Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/goodman/ames960403bu-aa/ames960403bu-aa_service-and-troubleshooting_2243425012.webp)
SYSTEM OPERATION
12
fan.
•
Integrated control module performs safety circuit checks.
•
Circulator blower is energized on low heat speed.
Electronic air cleaner terminals are energized.
•
Circulator blower runs, integrated control module
monitors safety circuits continuously.
Combustion Quality
Combustion quality can be affected by several factors. Major
factors are venting and draining.
Venting
The venting system should be planned and installed with the
following in mind;
•
Should not be longer than necessary
•
Use 45°elbows rather than 90° elbows when possible
•
Must not sag or otherwise trap condensate
•
Use longest radius fittings possible
•
If using 3” venting, make the transition from 2” to 3” as
close as practically possible
•
Make sure there is no flue gas recirculation into the
combustion air pipe
•
Condensate Drainage
Furnace combustion can be affected if a furnace is holding
condensate. Check for proper connections of drain hoses,
make sure furnace condensate trap is clean. Make sure
furnace is not improperly sloped. Make sure air conditioning
coil drain is not interfering with furnace drain.
Other Causes
1. Manifold Gas Pressure must be set within the range stated
on the furnace rating plate.
2. Remove Draft Inducer, Check the integrity of the gasket
between the inducer and the collector box cover, any
air leak here will have a negative effect on combustion.
Check the orifice hole in the collector box, it must be free
of burrs on both sides.
3. Make sure the field installed gas line is not binding and
causing distortion of burner assembly
4. If the furnace is installed as a one pipe system; make
sure the surrounding area and structure are adequate
to provide combustion air
5. Make sure there are no cabinet air leaks allowing sup-
ply air to affect combustion
6. If heat exchanger integrity is uncertain, follow proce-
dures in Service Bulletin SF-041
Concentric Vent Kits (DCVK) Application
The DCVK-20 and DCVK-30 kit is designed to allow the
terminations of a direct vent furnace to be “concentrically”
vented through a wall or roof. This kit allows a single
penetration to support terminations for both the vent/flue pipe
and the combustion air intake pipe.
(DCVK) Vent Termination Clearances
1. Determine termination locations based on clearances
specified in furnace installation instructions, and following
steps as shown in Figures 1,3,6,7,8 and 9.
2. The vent termination must be located at least 12” above
ground or normally expected snow accumulation levels.
3. Do NOT terminate over public walkways. Avoid areas
where condensate may cause problems such as above
planters, patios, or adjacent to windows where steam
may cause fogging.
4. The vent termination shall be located at least 4’
horizontally from any electric meter, gas meter, regulator
and any relief equipment. These distances apply ONLY
to U.S. Installations.
5. The vent termination shall be located at least 3’ above
any forced air inlet located within 10’; and at least 10’
from a combustion air intake of another appliance, except
another direct vent furnace intake.
6. In Canada, the Canadian Fuel Gas Code takes
precedence over the preceding termination instructions.
3" or 4" Diameter
SDR-26 Pipe
2 or 2 1/2" Diameter
SDR-26 Pipe
2" or 3" Diameter
Y Concentric Fitting
2" or 3" Diameter
Rain Cap
These kits are for vertical or horizontal termination of the
combustion air inlet and the exhaust vent pipes on Category
IV gas-fired condensing furnaces. The DCVK-30 kit can be
used for 3” diameter pipe systems. The DCVK-20 kit can be
used for the 2” diameter pipe system. For the correct pipe size
for the furnace. Both the combustion air inlet and the exhaust
vent pipes must attach to the termination kit. The termination
kit must terminate outside the structure and must be installed
per the instructions outlined below for vertical or horizontal
termination. Vertical termination is preferred. Field supplied
pipe and fittings are required to complete the installation.
Содержание AMES960403BU AA
Страница 25: ...TROUBLESHOOTING 25...
Страница 26: ...TROUBLESHOOTING 26...