5. Assemble the throttle servo mount using the supplied laser cut parts or there is a servo cutout in the
bottom of the engine box for 28cc-38cc engines. Mount your throttle servo and complete your linkage setup.
A hole will need to be drilled on the firewall to allow the pushrod to connect to the throttle arm on the carb.
6. An extra servo can be fitted for choke or a mechanical linkage can be used.
7. The KUZA new 410cc(14oz) fuel tank is preassembled. Complete the installation in the fuselage using zip
ties or velcro straps to hold the tank in position. Connect a fuel line between the tank and carb, a fuel line
between the tank vent and the bottom of the fuselage, and a fill line to a fueling port which can be mounted
on the fuselage side opposite your ignition switch. Make sure your vent line does not come close to any hot
exhaust part such as the muffler or canister. We recommend the use of small zip ties or fuel line clamps to
secure the lines to the tank.
Содержание 77in CORVUS 35CC & 170E
Страница 1: ...GoldWing RC 77in CORVUS 35CC 170E Giant Scale Aerobatic Aircraft...
Страница 5: ...Canopy extended into cowl Two Quick stainless steel release canopy latch...
Страница 7: ...Including KUZA CNC Aluminum Fuel Dot Fuel Vent Line Plug for 35CC version...
Страница 9: ...Scheme A White Yellow black Scheme B Red White black...
Страница 10: ...Scheme C White red black...
Страница 39: ...3 Fix the battery with both Velcro and straps...
Страница 47: ...GoldWing RC www goldwingrc com...