- 8 -
SUGGESTED TOOL REQUIREMENTS
SCREW, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit out from the cabinet by gripping
the base pan handle and pulling forward while
bracing the cabinet.
3. Remove EPS Material.
4. Cut the window sash seal to the proper length.
Peel off the backing and attach the foam-pe
¤
to the underside of the window sash.
5. Remove the backing from the top upper guide
Foam PE
¤æ
and attach it to the bottom of the
upper guide
¤ .
6. Attach the upper guide onto the top of the
cabinet with 3 type A screws.
7. Insert the frame guides
¤
into the bottom of
the cabinet.
8. Insert the Frame Curtain
¤
into the upper
guide
¤
and frame guides
¤
.
9. Fasten the curtains to the unit with 4 Type A
screws at both sides.
CABINET INSTALLATION
1. Open the window. Mark a line on center of the
window stool(or desired air conditioner
location).
Carefully place the cabinet on the window
stool and align the center mark on the bottom
front with the center line marked in the
window stool.
2. Pull the bottom window sash down behind the
upper guide until it meets.
NOTE:
• Do not pull the window sash down so tightly
that the movement of Frame Curtain is
restricted.
9
10
11
10
5
5
5
12
12
Fig. 1
Fig. 2
(Type A)
Window stool
Upper guide
¤
Window Sash
Foam-pe
¤
Cabinet
Frame Curtain
¤
Foam-pe
¤æ
Front Angle
Upper Guide
(Type A)
Shipping screws
EPS Material
Содержание LW-C1230XL
Страница 13: ...P NO 3828AR3924S Printed in Korea ...