background image

3

Fit

 

burners

 

and

 

trivet

.

Replace

 

burners

 

and

 

ensure

 

they

 

are

 

correctly

 

repositioned

 

over

 

the

 

ignitor

 (

S

and

 

\

thermocouple

 (

T

). 

The

 

ignitor

 (

S

must

 

be

 

clean

 

for

 

trouble

 

free

 

sparking

Test

 

burner

 

ignition

 

and

 

burner

 

flame

 

for

 

correct

 

operation

If

 

burner

 

is

 

placed

 

correctly

 

it

 

will

 

not

 

rotate

 

on

 

its

 

supports

.. 

The

 

DCC

 (

Wok

burner

 (

diagrams

 

below

does

 

not

 

fit

 

over

 

the

 

igniter

 

or

 

thermocouple

 

but

 

must

 

be

 

placed

 

on

 

its

 

supports

.

4

Electrical

 

connection

.

Install

 

a

 

10

 

amp

 

general

 

purpose

 

outlet

 (

GPO

in

 

accordance

 

with

 

relevant

 

electrical

 

standards

 

and

/

or

 

codes

 

of

 

practice

 

applicable

The

 

power

 

supply

 

cord

 (

supplied

must

 

not

 

touch

 

against

 

any

 

hot

 

surfaces

 

and

 

must

 

be

 

placed

 

so

 

that

 

its

 

temperature

 

does

 

not

 

exceed

 

75

 

at

 

any

 

point

 

along

 

its

 

length

After

 

having

 

installed

 

the

 

hotplate

the

 

GPO

 

must

 

always

 

be

 

in

 

an

 

accessible

 

position

Wiring

 

diagram

 

for

 

1

Cupboard

 

Cutting

Bench

 

top

 

thickness

30

– 

40

 

mm

 (

3

 – 

4

 

cm

). 

2

Place

 

burner

 

box

Apply

 

the

 

adhesive

 

sealing

 

tape

 

to

 

the

 

underside

 

lip

 

of

 

the

 

burner

 

box

Shown

 

at

 

G

 

opposite

Place

 

burner

 

box

 

into

 

cutout

 

hole

 

and

 

fit

 

clamping

 

brackets

 

to

 

clamp

 

the

 

hotplate

 

to

 

the

 

bench

Issue Date :- 23/05/2017

Issue Date :- 23/05/2017

Содержание GLS2-923GSB1

Страница 1: ...contains important information including safety installation points which will enable you to get the most out of your appliance Please keep it in a safe place so that it is easily available for future...

Страница 2: ...dren who because of their physical sensory or mental capabilities or their inexperience or ignorance are not able to use the device safely should not use this device without supervision or instruction...

Страница 3: ...g onto it The edge of the glass ceramic can be damaged by being knocked by the cookware Cookware made of cast iron cast aluminum or with damaged bottoms can scratch the glass toughened if pushed acros...

Страница 4: ...pid Burner Aux Auxiliary Burner Tempered glass Trivet Control knobs Wok R Aux SR 3 Tempered glass Trivet Control knobs Model No Wok Wok Burner R Rapid Burner SR SemiRapid Burner Aux Auxiliary Burner W...

Страница 5: ...installation Before cutting into any bench tops ensure the minimum clearances to walls adjacent surfaces and overhead surfaces required by the relevant gas appliance installation code see above will c...

Страница 6: ...se outlet GPO in accordance with relevant electrical standards and or codes of practice applicable The power supply cord supplied must not touch against any hot surfaces and must be placed so that its...

Страница 7: ...orised personnel may convert the hotplate from Natural gas to Universal LPG or from Universal LPG to Natural gas Contact the manufacturer or agent as required Wiring diagram for 5 Gas connection Insta...

Страница 8: ...ronic spark ignitors so must be connected to mains power supply i e nominal 220 240 V ac to operate If power is not available the hotplate will still work but the burners will have to be lit with a ma...

Страница 9: ...PANEL e to W a to TRIVETS UTENSIL SUPPORTS a a BURNERS W a a item to S T S T Wok it Gas Conversion ULPG NG kit The ULPG to NG conversion kit contains T Jet 0 9mm Semi Rapid Jet 1 18mm Rapid Jet 1 55mm...

Страница 10: ...tains T T 0 53mm Semi Rapid Jet 0 69mm Rapid Jet 0 9mm Wok Jet 0 50mm IN 1 02mm OUT Converting to a gas type to T kit a 2 to 2 Changing the jets 1 2 a to kit 3 kit to Setting the minimum level 1 2 3 t...

Страница 11: ...Semi rapid Rapid Wok 0 90 1 18 1 55 0 8 1 8 4 0MJ h 6 5MJ h 10 8MJ h 17 2MJ h 34 4 38 4 34 2 45 38 5 38 5 31 FAULT POSSIBLE CAUSE REMEDY Check plugged in and switched on Check mains circuit breaker C...

Страница 12: ...of acceptable quality and the failure does not amount to a major failure 1 8 You must provide proof of your purchase of the Goldline product and the date of purchase in order to obtain the benefit of...

Отзывы: