OWNER’S MANUAL
page 34
STEP
19
ASSEMBLING TURNTABLE TOP PLINTH
[Platter Bearing/Spindle]
270mm Bronze bearing and C40 rectified polished
Spindle (1x) located in
A1
position
3
Aluminium Platter Bearing blocking Nut (1x) located
in
B5
position
3
For the
STEP 19
you need these parts:
STEP 19-1
Insert the 270mm Bronze bearing and C40 rectified polished
Spindle into the Platter Flange hole as shown in the picture aside.
STEP 19-2
Tighten the Aluminium Platter Bearing blocking Nut on the 270mm Bronze
bearing externally threaded as shown in the picture aside.