2410E and 2411E
MODEL # 2410E AND 2411E
11
NEW PADDLE & HUB SEAL KIT INSTALLATION
and Kettle Shaft Maintenance
1. Unscrew the wing bolt (Mixing Paddle Lock Stud Assy.) and remove the mix paddles.
2. Remove the old hub seal assembly.
3. Clean the area around the center hub. Clean up all food and carbon residue.
Note:
For units manufactured prior to Jan. 1, 2014 only (kettle bushings have an
o-ring groove and o-ring). F
or these units, the kettle’s agitator shaft should be removed
monthly and the bushings lubricated with Never Seez® (use White Food Grade
ONLY
). To
do this, loosen the set screw in the Jaw Coupling and remove the shaft.
DO NOT lose the
shaft key; this must be reset into place when reassembling.
4. Remove any burrs on the top edge of the center hub. Use a fine grit emery paper to lightly sand the
surface. If the burrs are not removed, damage may occur to the hub assembly during installation.
5. Lightly lubricate the center hub of the kettle with a small amount of vegetable oil to allow for easy
installation of the hub seal assembly.
6. Slide the hub seal assembly down the agitator shaft. Apply pressure to ease the assembly over the
center hub of the kettle until it seats properly. (See diagram below.)
7. After the hub seal assembly has been properly installed, place the new mix paddles on the top of the
agitator shaft.
8.
Replace the wing bolts and finger tighten.
Agitator Shaft
Mixing Paddle
Wing Bolt
(Mixing Paddle
Lock Stud Assy.)
Hub Seal
Assembly
p/n 46646
O-Ring p/n 46641
(inc. w/ p/n 46646)