background image

HARDWARE IDENTIFIER

1/2” Split

Lock Washer

(2 Pieces)

18

        -13 x 1”

Hex Bolt

(2 Pieces)

19

       Flat Washer

(2 Pieces)

3

/

1 2”

/

1 2”

Pull Pin

(1 Piece)

41

Hardware located in 4A-7081-00 box

5

1/2”

X 1-1/4” Dia. Plastic-Washer

(4 Pieces)

5/8” Flat Washer

(8 Pieces)

37

5/8” Thread

Protector

(4 Pieces)

34

Hardware located in Anchor kit box

7

7

1/2”-13

Nylon Insert Locknut

(3 Pieces)

4

1/2”-13

Nylon Insert 

Locknut (Thin)

(4 Pieces)

47

3/4” OD x 6-3/4

Pivot Tube (1 Piece)

14

14

1/2”-13 x 11”

Hex Bolt

(1 Piece)

1/2”-13 x 11”

Hex Bolt

(1 Piece)

3

Содержание B3100W

Страница 1: ...nside all parts and cartons before assembling or ordering parts 3 To make assembly of your basketball system easier use the Hardware Identifier on page 3 and 4 to identify and sort all fasteners Check...

Страница 2: ...2...

Страница 3: ...ed in 4A 7081 00 box 5 1 2 X 1 1 4 Dia Plastic Washer 4 Pieces 5 8 Flat Washer 8 Pieces 37 5 8 Thread Protector 4 Pieces 34 Hardware located in Anchor kit box 7 7 1 2 13 Nylon Insert Locknut 3 Pieces...

Страница 4: ...1 4 Dia Plastic Washer 20 Pieces 3 8 Flat Washer 8 Pieces 45 Hardware required for rim assembly 4 pieces 3 8 X 19mm Flat Washer 1 2 13 x 12 Hex Bolt 2 Pieces 1 2 13 x 12 Hex Bolt 2 Pieces 3 8 16 Nylo...

Страница 5: ...en THESE NUTS USED FOR LEVELING OVERHANG 18 INCH MINIMUM REAR CLEARANCE REQUIRED Note When digging hole if you hit rock and cannot dig through contact a contractor Note Minimum of 18 rear clearance is...

Страница 6: ...y of the Plastic Washers 5 provided These washers adequately space painted parts at all pivot points Neglecting the use of these washers will result in rusted parts NOTE All board arms are made of rec...

Страница 7: ...se a rubber mallet to tap plug in 6 Secure Actuator 16 to Lower Arm 11 using one bolt 8 two flat washers 3 four plastic washers 5 and one hex nut 4 See Figure 6 Tighten both bolts 8 securing Lower Arm...

Страница 8: ...LE ADULTS POLE WILL WANT TO LEAN WHILE ATTEMPTING TO STAND IT UP ON ANCHOR BOLTS Push on Thread Protector Cap 34 until it is securely in place Cap may be tight push hard but DO NOT hit with a hammer S...

Страница 9: ...f Actuator 16 Line up hole in shaft with hole in Actuator Handle and insert Pull Pin 41 to secure Toaid in the assembly of the backboard lower the lower board arm 11 by turning the Actuator Crank unti...

Страница 10: ...ard Arms to lower mounting holes on backboard using two bolts 20 two step bushings 22 shipped already installed four plastic washers 5 four flat washers 3 and two thin locknuts 47 See Figure 10 Note D...

Страница 11: ...ther leveling is required loosen top 35 nuts but do not loosen past the top of 39 J Bolt DO NOT REMOVE NUTS 35 Place a level on pole and adjust bottom nuts 35 with a 15 16 open end wrench until pole i...

Страница 12: ...ly place height decal on backside of steel actuator 16 and line up the 10 ft mark on the tape with the 10 ft mark on the height decal Decal should fit correctly onto the backside of the steel actuator...

Страница 13: ...ons or liability on the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warranty s...

Страница 14: ...tems needed to clean backboard 100 cotton soft cloth only Glass cleaner Clean backboard using only a 100 Cotton soft cloth and glass cleaner Clean glass as you would clean household windows Strong cle...

Страница 15: ...28 32 31 29 30 23 20 3 5 22 11 22 5 3 20 47 3 5 22 5 3 20 6 22 5 20 3 5 3 47 26 33 47 3 5 F H E G D C C D 47 3 5 B A H G B A E F 2L 7254 03 15...

Страница 16: ...2L 7254 03 6 7 5 3 9 9 5 5 3 4 5 14 5 15 19 18 3 5 5 44 46 44 46 5 5 3 18 19 42 41 39 40 35 35 37 34 35 36 37 38 2 10 10 5 3 4 5 3 4 5 5 3 8 5 3 8 1 17 11 45 33 33 45 16 A B B A 45 45 13 16...

Отзывы: