- 5 A SIL 3 Relay Output Module 

G.M. International ISM0152-8 

 

Configuration 

An eight position DIP Switch is located on component side of pcb in order to set four mutually exclusive configurations: 

1) line input monitoring, to allow DCS/PLC line input monitoring function (driving line pulse testing); 
2) low voltage input monitoring (UVLO—under voltage lock out): module reflects a high impedance state to the control unit when the driving voltage is below the specified threshold; 
3) short circuit fault detection: it allows DCS/PLC to detect short circuit fault of module; 
4) T-proof relay testing. 

ON 

1) line input monitoring: 

2) low voltage input monitoring: 

3) short circuit fault detection: 

4) T-proof relay testing: 

DIP switch configurations: 

1

2

3

4

5

6

7

8

ON

OFF OFF OFF OFF OFF OFF  ON   ON

1

2

3

4

5

6

7

8

ON

OFF OFF OFF OFF OFF OFF  ON  OFF

1

2

3

4

5

6

7

8

ON

OFF  ON  OFF  ON  OFF  ON  ON   ON

T-proof relays enable

1

3

5

1

3

5

Normal Operation

ON ON

OFF

ON

OFF

OFF

T-proof relays (dip1 = relay1;

dip3 = relay2; dip5 = relay3)

1

2

3

4

5

6

7

8

ON

 ON  OFF  ON  OFF  ON OFF  ON   ON

 

Please, see next page for testing procedure at T-proof. 

    

WARNING: 

after T-proof test, dip-switch 1-3-5 must be set to “OFF” position for normal operation. 

Can be used only for Functional Safety applications 

n° 1, 2, 3, 4 with NE Relay condition 

Must not used for Functional Safety applications  

n° 5, 6 with ND Relay condition! 

This is factory settings 

Содержание D5290S-078

Страница 1: ...IL 3 Relay Output Module G M International ISM0152 8 5 A SIL 3 Relay Output Module for NE or ND Loads with NE or ND Relay condition DIN Rail and Termination Board Model D5290S 078 D5290S 078 INSTRUCTI...

Страница 2: ...14 conforms to EN60079 0 EN60079 15 IECEx BVS 10 0072 X conforms to IEC60079 0 IEC60079 15 INMETRO DNV 13 0109 X conforms to ABNT NBR IEC60079 0 ABNT NBR IEC60079 15 UL C UL E477485 conforms to ANSI U...

Страница 3: ...tion n 6 Systematic capability SIL 3 Installation in Zone 2 Division 2 5 A SIL 3 SIL 2 contacts for NE or ND loads with NE or ND Relay condition 8 A inrush current at 30 Vdc 250 Vac Line input monitor...

Страница 4: ...tor 22 21 19 20 23 24 Out S_1 NO contact 13 14 Out P_1 NC contact 17 18 16 15 Out S_2 NO contact Out S_4 NO contact Out P_2 NC contact Out S_3 NO contact To prevent relay contacts from damaging connec...

Страница 5: ...operation of relay module is energized with NE Normally Energized loads In case of alarm or request from process the relay module is de energized safe state de energizing loads The failure behaviour o...

Страница 6: ...ication the normal state operation of relay module is energized with NE Normally Energized loads In case of alarm or request from process the relay module is de energized safe state de energizing load...

Страница 7: ...nd mode as a Type A module having Hardware Fault Tolerance HFT 0 In the 3rd Functional Safety application the normal state operation of relay module is energized with NE Normally Energized loads In ca...

Страница 8: ...energized with ND Normally De energized loads In case of alarm or request from process the relay module is de energized safe state energizing loads The failure behaviour of all relay modules here cons...

Страница 9: ...ribed by the following definitions fail Safe State it is defined as the output load being energized fail Safe this failure causes the system to go to the defined fail safe state without a process dema...

Страница 10: ...s a Type A module having Hardware Fault Tolerance HFT 0 In the 6th Functional Safety application the normal state operation of relay module is de energized with ND loads In case of alarm or request fr...

Страница 11: ...5 the short circuit of each single relay coil and to verify the ohmic continuity of the contacts as described in the following procedure 1 Do not supply the input channel terminals 1 2 or 3 4 of modul...

Страница 12: ...i e IP54 to IP65 or NEMA type 12 13 consistent with the effective operating environment of the specific installation Units must be protected against dirt dust extreme mechanical e g vibration impact a...

Страница 13: ...g ON 1 line input monitoring 2 low voltage input monitoring 3 short circuit fault detection 4 T proof relay testing DIP switch configurations 1 2 3 4 5 6 7 8 ON OFF OFF OFF OFF OFF OFF ON ON 1 2 3 4 5...

Отзывы: