background image

 

 

5.  Opening the swing gate in case of power failure 

 

Loosen the lever for manual control (B) counter clockwise from the pivot arm (A) and remove it. 
After that the gate can be opened by hand. 
To electrically operate the gate again, repeat the previous steps in the reverse order.  
First, move the gate to the position in which it was unlocked, then turn the lever for manual control 
(B) clockwise until the lever is back in line with the pivot arm (A) (the manual clutch can be secured 
by means of a padlock). 

 

 

 

 Lever for manual 

control (B) 

 
 
 
 

 

 
 
 

 

 Straight pivot arm 
(A) 

 

 
 

6. Electrical connection 

 

CAUTION: always remove the fuses when working on the installation!

 

 

 

OPTIMUS 230V MONO - E - 30-07-18

7/7

Отзывы: