Installation
:
When installing machine should be installed in a horizontal on the bottom of foundation,
level the machine very well, using leveling pads or foundation bolts.
IV. Safety inspection and Safety rules during and/or before operation
To ensure safety, it is necessary to do the following inspections for this machine after installation.
Check if the transportation procedure has influenced the accuracy and functions of the machine.
Check if the foundation of the machine is appropriate.
Check if the machine's main power switch should have earth wiring connected.
Use the multitester to check the stability of the three-phase voltage, and the low voltage must be the range of
208V-240V or high voltage must be 440V-480V, can not use voltage higher than 480V.
Check if the control panel function and push button are functioning
Check emergency stop function.
Check if safety protection accessories are functioning well
Check if other accessories, including hydraulic and pneumatic ones, are connected well (including transformer etc.)
Check if the oil amount indicator and air pressure indicator are normal.
Make sure no obstacle is around machine and control system.
Make sure no personnel are in dangerous area.
Tools and any unnecessary items are not allowed on the machine, moving parts, or similar locations.
Содержание HBB-0410
Страница 3: ...2 ...
Страница 4: ...3 ...
Страница 12: ...11 VIII Hydraulic diagram ...
Страница 13: ...12 ...
Страница 14: ...13 IX ...
Страница 19: ...18 XI Parts breakdown manual and parts list ...
Страница 20: ...19 ...
Страница 21: ...20 ...
Страница 22: ...21 ...
Страница 28: ...27 ...