Installation 4
0020200967_00 SUSTAIN ..s Installation and maintenance instructions
9
4.4
Dimensions
96
121
34
123
185
390
123
170
702
150
1
2
3
4
1
Heating flow
2
Gas connection
3
Heating return
4
Flue pipe connection
4.5
Minimum clearances
C
C
A
B
D
Minimum clearance
A
150 mm
B
150 mm
C
5 mm
D
600 mm
4.6
Clearance from combustible components
It is not necessary to maintain a clearance between the
product and components made of combustible materials.
4.7
Using the installation template
▶
Use the installation template to ascertain the locations at
which you need to drill holes and make breakthroughs.
4.8
Wall-mounting the product
Note
If you are using the rear air/flue gas connection,
install the flue pipe before you wall-mount the
product.
B
A
1.
Check whether the wall has sufficient load-bearing ca-
pacity to bear the operational weight of the product.
2.
Check if the supplied fixing material may be used for
the wall.
Conditions
: The load-bearing capacity of the wall is sufficient, The fixing
material may be used for the wall
▶
Wall-mount the product as described.
Содержание ENERGY 12s-A
Страница 47: ......