Glow-worm Economy Plus C 40 Скачать руководство пользователя страница 9

Supplied By www.heating spares.co  Tel. 0161 620 6677

9

221461C

3 Water Systems

3.6 Expansion Vessel

A diaphragm type expansion vessel, conforming to the current
issue of BS4814 (see also the current issue of BS7074 Part 1
and 2) must be connected at a point close to the inlet side of the
circulating pump, see diagram 3.3, unless laid down differently
by the manufacturer.

The expansion vessel volume depends on the total water
system volume and the initial system design pressure.  For any
system an accurate calculation of vessel volume size is given
in the current issue of BS7074 Part 1.

Example:  For an initial system design pressure of 0.7bar the
minimum total vessel volume required is 0.063xTotal System
volume.

Guidance is also given in the current issue of BS5449.

The charge pressure must not be less than the static head of the
system, that is, the height of the highest point of the system
above the expansion vessel.

The water capacity of the boiler is given in Section 1.

3.7 Pressure Gauge

A pressure gauge with a set pointer and covering at least the
range of 0 to 4 bar (0 to 60lb/in

2

) shall be permanently fitted to

the system in a position where it can be seen when filling the
system.

3 LITRES (0.66 gals)
MAKE-UP BOTTLE
(if required)

NON-RETURN
VALVE

AUTO
AIR
VENT

FLOW

DRAIN
COCK

BOILER

SAFETY
VALVE

(Make-up
alternatives)

EXPANSION
VESSEL

PRESSURE
GAUGE

CIRCULATING
PUMP

FILLING POINT

AIR
RELEASE
POINT

HEATING

CIRCUIT

15mm (min)
BY-PASS WITH
LOCKSHIELD 
VALVE

RETURN

SEALED WATER SYSTEM DIAGRAMMATIC LAYOUT

EXPANSION VESSEL SYSTEM

EXPANSION VESSEL

PRESSURE (BAR)

A = SYSTEM VOLUME

Diagram 3.4

INTIAL SYSTEM

PRESSURE (BAR)

EXPANSION VESSEL

VOLUME (LITRES)

INTIAL SYSTEM

PRESSURE (BAR)

EXPANSION VESSEL

VOLUME (LITRES)

EXPANSION VESSEL

PRESSURE (BAR)

0.5

1.0

A X 0.075

A X 0.126

A X 0.098

A X 0.171

0.5

1.0

1.0

1.5

Diagram 3.3

5812

Содержание Economy Plus C 40

Страница 1: ...y telephoning the Heatcall Customer Service number 01773 828100 Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Open Flu...

Страница 2: ...fractory Ceramic Fibre RCF which are man made vitreous silicate fibres Excessive exposure to these materials may cause temporary irritation to eyes skin and respiratory tract consequently it makes sen...

Страница 3: ...ed off to avoid the risk of freezing up If an immersion heater is fitted in the domestic hot water cylinder make sure that it is switched off If you have a sealed water system you should contact your...

Страница 4: ...little longer The flue blockage safety device may also need resetting refer to safety device instructions Make sure that the pilot is alight and stable Switch on the electrical supply to the boiler Ch...

Страница 5: ...andards Scotland Regulations applicable in Scotland local Water Company Byelaws The HealthandSafetyatWorkAct ControlofSubstancesHazardous to Health The Electricity at Work Regulations and any local ap...

Страница 6: ...boiler must be insulated PVC flexible type to the current issue of BS6500 Table 16 not less than 0 75mm2 24 0 20mm 1 9 Draining Tap A draining tap must be provided at the lowest points of the system w...

Страница 7: ...easy removal of the boiler Where the boiler is fitted in a cupboard or compartment permanent high and low level ventilation must be provided The minimum ventilation areas required are given in Table A...

Страница 8: ...acturer for their recommendations for the best product to use When installing a boiler in an existing system whether or not using an inhibitor take special care to drain the entire system including th...

Страница 9: ...he static head of the system that is the height of the highest point of the system above the expansion vessel The water capacity of the boiler is given in Section 1 3 7 Pressure Gauge A pressure gauge...

Страница 10: ...her the heating circuit of the domestic hot water cylinder Alternatively provision for make up can be made by using a filling loop 3 10 Filling a Sealed Water System Provision for filling the system a...

Страница 11: ...cut back external to the cable clamp When making connections make sure that the earth conductor ismadeofagreaterlengththanthecurrentcarryingconductors so that if the cable is strained the earth condu...

Страница 12: ...AINS SUPPLY FUSED AT 3A L N L N BROWN BLUE GRN YEL GAS VALVE BROWN BROWN RED RED PURPLE BLUE BROWN BLUE GRN YELLOW CHASSIS EARTH POST 3 7 6 8 9 Remove Red Link between 9 and SL when fitting a time con...

Страница 13: ...GAS CONTROL KNOB C IGNITER BUTTON G VIEWING WINDOW H GAS RATE ADJUSTMENT SCREW UNDER COVER SCREW J GAS SERVICE COCK K PRESSURE TEST POINT L PILOT BURNER ADJUSTMENT SCREW M FLUE BLOCKAGE SAFETY DEVICE...

Страница 14: ...son Before starting a service or replacing parts isolate the gas and electrical supplies Unless stated otherwise all parts are replaced in the reverse order to removal 7 1 Heating Body Service Remove...

Страница 15: ...engaged on the injector manifold Diagram 7 2 ACCESS FOR SERVICING Diagram 7 3 PILOT ASSEMBLY PILOT INJECTOR ADAPTOR OLIVE PILOT TUBING NUT THERMOCOUPLE NUT IGNITION LEAD clear end ELECTRODE THERMOCOU...

Страница 16: ...gmakesurethesparkgapisasshownindiagram 7 7 Check the pilot burner flame lengths are as shown in diagram 7 7 7 5 Thermocouple Generally follow the instructions given in Section 7 1 Unscrew the thermoco...

Страница 17: ...rmostat phial pocket and withdraw the phial see diagram 7 8 Remove the control box by undoing the two fixing screws at the front and lower the front of the box until it is clear of the cover Push the...

Страница 18: ...ving the brass knurled screw s Inset B Carefully remove phial and capillary through back of boiler Inset C Having opened control box remove the electrical connections from the flue blockage safety dev...

Страница 19: ...ates before boiler cycles on maximum control thermostat setting Change faulty overheat cutoff device The correctly set overheat cutoff device operates prematurely There is no air in the heating body a...

Страница 20: ...overheat cut off Is there continuity YES NO NO 8 7 Thermocouple and Overheat Cutoff Device To test the thermocouple a meter with a range of 0 to 30 mV is required Symptom The pilot burner fails to st...

Страница 21: ...e and Flue Blockage Safety Device if faulty repair or renew Turn ON thermostat Does main burner light Turn ON thermostat With appliance cold Is there 240V between 7 and N Turn ON thermostat Is there 2...

Страница 22: ...ppliance has cooled down CONTROLS IN ORDER Faulty Cable PURPLE between thermostat and terminal block repair or renew Faulty pump inform customer Faulty thermostat renew YES YES YES NO NO NO YES Contin...

Страница 23: ...knob is released PILOT SATISFACTORY Does pilot flame envelop thermocouple Check aeration If necessary Clean pilot rectify blockage in pilot injector or replace Check thermocouple circuit using Thermo...

Страница 24: ...355 501 4 800014 Overheat cutoff device 313 064 5 800015 Gas valve assembly inc 14 313 067 6 900000 Thermocouple 394 162 7 203415 Pilot burner inc 12 394 161 8 202600 Electrode 384 149 9 416144 Contr...

Отзывы: