Air-to-water heat pump 6 kW

English

6 Assembly / connection

6.1 Assembly of the refrigerant line 

and electric wire

The refrigerant lines and electric wires for connecting the in-
door unit with the outdoor unit must be ordered separately as
accessories. 
To route the connection cables, create wall openings at a suita-
ble point. The wall opening must be protected from water pen-
etration according to the local conditions.
The wall openings should be sealed again correctly once the
routing work is complete. (For connecting the electric wire, see
cap. 6.6 on page 14, for co
nnecting the refrigerant line, see
cap. 6.7 on page 17).

6.2 Condensate drain

Condensate that forms during operation must be drained off
frost free. To ensure proper drainage, the outdoor unit must be
mounted horizontally.
The condensate tray offers various options for the condensate
drain:

Foundation covered with gravel. The leaching should be
min. 1.5 l per kW of heat output per day, and the diameter
of the drain pipe should be at least 50 mm.

Channel into a waste water, rain water or drainage channel 

If the condensate drain is installed at risk from frost, it must be
protected from freezing with a condensate drain heater, which
is available as a special accessory.
This must be connected in the outdoor unit, parallel to the noz-
zle ring heater (E4).

!!

ATTENTION!

The frost line can vary according to the climatic region. The
regulations of the countries in question must be observed.

6.3 Connection on heating side

Before connecting the heating system to the heat pump, the
heating system must be flushed to remove any impurities, resi-
due from sealants, etc. Any accumulation of deposits in the liq-
uefier may cause the heat pump to completely break down.
To enable better maintenance of the installed heating circuit
components, a purging option and shut-off option must be im-
plemented upstream and downstream of the indoor unit.

Once the heat pump has been connected to the heating sys-
tem, it must be filled, purged and pressure-tested.
When doing so, it must be ensured that all heating circuits and
isolating valves are open and that the 3-way reversing valve is in
heating operation (pos. 1 factory default). Fill the heating sys-
tem at the fill and drain cock (pos. 2) until system pressure (ap-
prox. 1.5 bar) is reached. A suitable  fill  hose  with  a  pressure
gauge should be used. When doing so, check all connections
and the entire heating system for leakages. The heating system
should be purged at the highest point (pos. 3, e.g. radiator, heat
pumps connection).
After all of the air has been purged here, the indoor unit must be
purged at the valves of the electric auxiliary heating (pos. 4) and
domestic hot water heat exchanger (pos. 5) until the heating
water also exits free of bubbles here.
When the power supply is attached, the reversing valve can be
switched between heating operation and domestic hot water
operation in the operating unit (User Interface) in the installer
level under control functions for improved purging.

Finally, close the fill and drain cock, check the system pressure
and top up if necessary.
The following points must be observed when filling the system:

Untreated filling water and make-up water must be of
drinking water quality
(colourless, clear, free of sediments)

Filling water and make-up water must be filtered (max.
pore size 5 µm).

Scale formation in domestic hot water heating systems cannot
be avoided, but in systems with flow temperatures below 60 °C,
the problem can be disregarded. With high-temperature heat
pumps and in particular with bivalent systems in the higher per-
formance range (heat pump + boiler combination), flow tem-
peratures of 60 °C and more can be achieved. The following
standard values should therefore be adhered to with regard to
the filling and make-up water according to VDI 2035, sheet 1:
The total hardness values can be found in the table.

5

3

3

2

4

4

1

Содержание 06CHOIAOC6

Страница 1: ...er no DOK4x HOIAO WxDEN EN FD 9912 System M Compact Plus 6kW Installation and Operating Instruction Air to Water Heat Pump in Integral Design Glen Dimplex Thermal Solutions Dimplex 06CHOIAOC6 06IHOIAO...

Страница 2: ......

Страница 3: ...e 11 6 2 Condensate drain 11 6 3 Connection on heating side 11 6 4 Domestic hot water connection 12 6 5 Temperature sensor connection 13 6 6 Electrical connection 14 6 7 Refrigerant pipe connections 1...

Страница 4: ...2 DOK4x HOIAO WxDEN FD 9912 www gdts one English Air to water heat pump 6 kW 17 Declaration of conformity 33...

Страница 5: ...to This unit can be used by children aged 8 and over and by per sons with limited physical sensory or mental aptitude or lack of experience and or knowledge providing they are supervised or have been...

Страница 6: ...the air i e ex tracts heat from it This extracted heat is then transferred to the working medium refrigerant in the evaporator The heat is pumped to a higher temperature level by increas ing its pres...

Страница 7: ...lve for generating domestic hot water 9 Switch box with heating controller 10 Overflow valve to guarantee the minimum heating water flow rate to be set by the installer 11 Universal hardware interface...

Страница 8: ...6 DOK4x HOIAO WxDEN FD 9912 www gdts one English Air to water heat pump 6 kW 3 2 Outdoor unit 1 Evaporator 2 Fan 3 Expansion valve 4 Switch box 5 Connection for refrigerant line 1 2 3 4 5...

Страница 9: ...be tilted back by up to 45 and lifted by the handles on the back at the top Tilting over 45 is not permitted without removing the refrigeration circuit beforehand To remove the refrigeration circuit r...

Страница 10: ...onnection 2 Disconnect the plug connections on the refrigeration cir cuit switch box 3 Loosen the mounting screws 4 Pull the refrigeration circuit out at the side and transport it to the intended loca...

Страница 11: ...The responsibility for the heat pump in stallation lies with the specialist system construction company During the installation local requirements such as building reg ulations static load of the bui...

Страница 12: ...on location at any time of the year The minimum volume of the room where the heat pump is in stalled must be no less than the following value depending on the refrigerant quantity in the device If the...

Страница 13: ...and shut off option must be im plemented upstream and downstream of the indoor unit Once the heat pump has been connected to the heating sys tem it must be filled purged and pressure tested When doin...

Страница 14: ...e ready for op eration The system must be drained if the heat pump is taken out of service or in the event of a power failure The heating cir cuit should be operated with a suitable frost protection i...

Страница 15: ...at all weather conditions are taken into consideration and the meas ured value is not falsified Mount on the external wall on the north or north west side where possible Do not install in a sheltered...

Страница 16: ...OK4x HOIAO WxDEN FD 9912 www gdts one English Air to water heat pump 6 kW 6 6 Electrical connection 6 6 1 Circuit diagram Symbol legend see cap 6 6 2 on page 15 Equipment marking see cap 6 6 3 on page...

Страница 17: ...ydraulics WPM A210 Master unit A220 Expansion module WPM A300 Electrical distribution system A350 Router A400 Hydraulic installation general A420 Domestic hot water B3 domestic hot water thermostat E1...

Страница 18: ...old cur rent because otherwise important protection functions could be lost during a utility block Utility block The utility blocking contactor K22 with main contact and auxiliary contact NO contact 1...

Страница 19: ...75 g 225 g HINWEIS NOTE If the indoor unit is mounted 2 5 m or more metres higher or lower than the outdoor unit a cooling technology specialist must perform a separate check to ensure that the device...

Страница 20: ...the system Step 1 Preparation Ensure that every pipe liquid and intake side between the in door and outdoor unit is connected correctly Ensure that both maintenance valves on the liquid and intake of...

Страница 21: ...ss varies with differ ent lengths of the pipework and the pump output The follow ing table shows the time required for pumping empty Step 4 Filling Once the leakage tightness test and evacuation have...

Страница 22: ...ing procedure to set the over flow valve correctly Close all heating circuits that may also be closed during opera tion depending on how the heat pump is being used so that the most unfavourable opera...

Страница 23: ...by a heating technician Based on current information we recommend using a 5 phosphoric acid solution for cleaning purposes However if cleaning needs to be performed more frequently a 5 formic acid sol...

Страница 24: ...rom the power supply HINWEIS NOTE Personal protective equipment protective goggles safety shoes and gloves where necessary must be used when work ing on the device Components with plastic parts must b...

Страница 25: ...nce of 1 m indoors4 dB A 38 38 3 7 Air flow Normal operation reduced operation3 m h 3000 2600 3000 2600 4 Dimensions weight and filling quantity 4 1 Device dimensions5 indoors without connections H x...

Страница 26: ...system other parameters in particular the defrosting capacity the bivalence point and regulation should also be taken into consideration These figures are only achieved with clean heat exchangers Info...

Страница 27: ...intake 0 3 m 1 0 m 0 5 m 0 5 m Minimum clearances Direction of air flow 358 40 460 40 17 5 4x Fixing holes base frame for M12 438 540 Hatched area footprint 600 871 500 165 40 40 53 36 676 472 99 160...

Страница 28: ...2 www gdts one English Air to water heat pump 6 kW 12 2 Dimension drawing indoor unit 2 1 2 6 2 8 2 7 2 3 2 4 2 5 2 2 544 600 600 2100 0 40 142 212 282 352 422 573 652 880 63 572 37 ca 0 68 118 195 25...

Страница 29: ...ugh refrigerant line 1 6 Optional feedthrough electric wires 1 7 External dimensions wood design variant 1 8 Included pipe set for optional rear connection of the re frigerant lines 2 Indoor unit 2 1...

Страница 30: ...25 20 15 10 5 0 5 10 15 20 25 30 35 40 max min 0 1 2 3 4 25 20 15 10 5 0 5 10 15 20 25 30 35 40 max min 10 15 20 25 30 35 40 45 50 55 60 65 25 20 15 10 5 0 5 10 15 20 25 30 35 40 Air intake temperatu...

Страница 31: ...ions of nitrogen oxides NOx mg kWh Declared load profile L Water heating energy efficiency wh 87 Daily electricity consumption Qelec 5 66 kWh Daily fuel consumption Qfuel kWh Contact details If Cdh is...

Страница 32: ...eclared load profile L Water heating energy efficiency wh 87 Daily electricity consumption Qelec 5 66 kWh Daily fuel consumption Qfuel kWh Contact details If Cdh is not determined by measurement nthen...

Страница 33: ...overed by the warranty If it was not possible to remedy the defect the manufacturer shall either deliver a replacement free of charge or issue a reimburse ment for the reduced value In cases in which...

Страница 34: ...en cryption methods III Use of service providers Personal data required for maintenance purposes such as your address contact details and framework data on the contract is made available to after sal...

Страница 35: ...www gdts one DOK4x HOIAO WxDEN FD 9912 33 Air to water heat pump 6 kW English 17 Declaration of conformity You can find and download the current CE conformity declaration at https gdts one m...

Страница 36: ...9 dimplex gdts one www gdts one Gesch ftsstelle sterreich Glen Dimplex Austria GmbH Hauptstra e 71 A 5302 Henndorf am Wallersee T 43 6214 20330 F 43 6214 203304 info dimplex at www dimplex at Office F...

Отзывы: