INSTALLER’S FINAL CHECK LIST
You must test the cooker after installation before you hand it over to the customer. You must
have a manometer and a connecting tube. The following checks have to be made to commission
the cooker and to activate the warranty:
INSTALLATION CHECK
• Have the supplied blue washers and fittings been used?
• Has a leak test with soapy water been performed?
• Is the regulator set for the correct gas type and pressure
• Are the jet sizes correct for the gas type?
• Is the product earthed & polarity correct to stop flickering of indicator lights?
• Has the power cable been checked to ensure it is not touching the product?
• Are the burner parts sitting correctly?
OPERATION CHECK
• Do all the burners ignite and stay on?
• Is the flame blue and appropriately sized?
• Does the oven burner ignite and stay on?
• Has the oven been operated and been seen to reaching temperature?
Model Number
Date of installation
Name of installer
Signature
License number
SERIAL NUMBER - this is a requirement to request warranty service
GLEM GAS AUSTRALASIA PTY. LTD.
P.O.Box 63 Blaxcell PO South Granville NSW 2142
Phone: 02 96433500 l Fax: 02 96433599 l www.glemgas.com.au
Email us [email protected]
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
28