background image

Page 33

  (b)  Subject to the other provisions of this clause 9 we accept liability for direct physical damage to tangible 

property to the extent that such damage is caused by our negligence or that of our employees, agents or 
subcontractors.

  (c)  Our total liability to the purchaser over and above any liability to replace under the Guarantees (whether 

in contract or in tort including negligence) in respect of any one cause of loss or damage claimed to result 
from any breach of our obligations hereunder, shall be limited to actual money damages which shall not 
exceed £20,000 provided that such monetary limit shall not apply to any liability on the part of ourselves 
referred to in paragraph (a) above

  (d)  Except as provided in paragraph (a) above but otherwise not withstanding any provision herein contained 

in no event shall we be liable for the following loss or damage howsoever caused and even if foreseeable 
by us or in our contemplation:-

   

(i)  economic loss which shall include loss of profits, business revenue, goodwill or anticipated savings 

   

(ii)  damages in respect of special indirect or consequential loss or damage (other than death, personal 

injury and damage to tangible property)

   

(iii)  any claim made against the purchaser by any other party (save as expressly provided in paragraph (b) 

above)

  (e)  Except in respect of our liability referred to in paragraph (a) above no claim may be made or action brought 

(whether in contract or in tort including negligence) by the purchaser in respect of any goods supplied by 
us more than one year after the date of the invoice for the relevant goods.

  (f)  Without prejudice to any other term we shall not be liable for any water damage caused directly or 

indirectly as a result of any leak or other defect in the goods.    We cannot control the conditions of use of 
the goods or the time or manner or location in which they will be installed and the purchaser agrees to be 
fully responsible for testing and checking all works which include the goods at all relevant times (up to, 
including and after commissioning) and for taking all necessary steps to identify any leaks and prevent any 
damage being caused thereby.

  (g)  Nothing in these Conditions shall confer on the purchaser any rights or remedies to which the purchaser 

would not otherwise be legally entitled

10. 

LOSS OR INJURY 

Notwithstanding any other provision contained herein the purchaser’s hereby agree to fully indemnify us against 
any damages losses costs claims or expenses incurred by us in respect of any claim brought against us by any third 
party for:-
(a) 

any loss injury or damage wholly or partly caused by any goods supplied by us or their use.

(b) 

any loss injury or damage wholly or partly caused by the defective installation or substandard workmanship or 
materials used in the installation of any goods supplied by us.

(c) 

any loss injury or damage in any way connected with the performance of this contract.

(d) 

any loss resulting from any failure by the purchaser to comply with its obligations under these terms as to 
install and/or check  works correctly.

PROVIDED

 that this paragraph will not require the purchaser to indemnify us against any liability for our own acts of 

negligence or those of our employees agents or sub-contractors

FURTHER

 in the case of goods supplied by us which are re-sold and installed by a third party by the purchaser it will 

be the sole responsibility of the purchaser to test the goods immediately after their installation to ensure that inter 
alia they are correctly installed and in proper working order free from leaks and are not likely to cause any loss injury 
or damage to any person or property.

11.   VARIATION OF WARRANTY AND EXCLUSION

Should our warranty and exclusion be unacceptable we are prepared to negotiate for variation in their terms but 
only on the basis of an increase in the price to allow for any additional liability or risk which may result from the 
variation. Purchasers are advised to insure against any risk or liability which they may incur and which is not covered 
by our warranty.

12.   ADVICE

Any advice or assistance given by the Company is provided without charge and is in good faith without undertaking, 
representation or warranty, and we will not accept any liability, whether consequential or compensatory, for advice 
or assistance given.

13.   RISK AND RETENTION OF TITLE

(a)   goods supplied by us shall be at the Purchaser’s risk immediately upon delivery to the Purchaser or into 

custody on the Purchaser’s behalf or to the Purchaser’s Order.  The Purchaser shall effect adequate insurance 
of the goods against all risks to the full invoice value of the goods, such insurance to be effective from the time 
of delivery until property in the goods shall pass to the Purchaser as hereinafter provided.

(b)  

property in the goods supplied hereunder will pass to the Purchaser when full payment has been made by the 
Purchaser to us for :-

  (i)   the goods of the subject of this contract.
  (ii)   all other goods the subject to of any other contract between the Purchaser and us which, at the time of 

payment of the full price of the goods sold under this contract, have been delivered to the Purchaser but 
not paid for in full.

(c)  

until property in the goods supplied hereunder passes to the Purchaser in accordance with paragraph (2) 
above.

  (i)   the Purchaser shall hold the goods in a fiduciary capacity for us and shall store the same separately from 

any other goods in the Purchaser’s possession and in a manner which enables them to be identified as our 
goods.

  (ii)   the Purchaser shall immediately return the goods to us should our authorised representative so request.  

All the necessary incidents associated with a fiduciary relationship shall apply.

(d)  

the Purchaser’s right to possess the goods shall cease forthwith upon the happening of any of the following 
events, namely :-

  (i)   if the Purchaser fails to make payment in full for the goods within the time stipulated in clause 4 hereof.
  (ii)   if the Purchaser, not being a company, commits any act of bankruptcy, makes a proposal to his or her 

creditors for a compromise or does anything which would entitle a petition for a Bankruptcy Order to be 
presented.

  (iii)  if the Purchaser, being a company, does anything or fails to do anything which would entitle an 

administrator or an administrative receiver or a receiver to take possession of any assets or which would 
entitle any person to present a petition for winding up or to apply for an administration order.

(e) 

the Purchaser hereby grants to us an irrevocable licence to enter at any time any vehicle or premises owned 
or occupied by the Purchaser or in the possession of the Purchaser for the purposes of repossessing and 
recovering any such goods the property in which has remained in us under paragraph (2) above.  We shall 
not be responsible for and the Purchaser  will indemnify us against liability in respect of damage caused to 

any vehicle or premises in such repossession and 
removal being damaged which it was not reasonably 
practicable to avoid.

(f)  

notwithstanding paragraph (3) hereof and subject to 
paragraph (7) hereof, the Purchaser shall be permitted 
to sell the goods to third parties in the normal course 
of business.  In this respect the Purchaser shall act 
in the capacity of our commission agent and the 
proceeds of such sale :-

 (i) 

 shall be held in trust for us in a manner which 

enables such proceeds to be identified as such, and:

  (ii)   shall not be mixed with other monies nor paid into 

an overdrawn bank account.

 

We, as principal, shall remunerate the Purchaser as 
commission agent a commission depending upon 
the surplus which the Purchaser can obtain over and 
above the sum, stipulated in this contract of supply 
which will satisfy us.

(g)   in the event that the Purchaser shall sell any of the 

goods pursuant to clause (6) hereof, the Purchaser 
shall forthwith inform us in writing of such sale and of 
the identity and address of the third party to whom the 
goods have been sold.

(h)  if, before property in the goods passes to the 

Purchaser under paragraph (2) above the goods are or 
become affixed to any land or building owned by the 
Purchaser it is hereby agreed and declared that such 
affixation shall not have the effect of passing property 
in the goods to the Purchaser.  Furthermore if, before 
property in the goods shall pass to the Purchaser 
under paragraph (2) hereof, the goods are or become 
affixed to any land or building (whether or not owned 
by the Purchaser), the Purchaser  shall:-

 (i) 

 ensure that the goods are capable of being removed 

without material injury to such land or building.

  (ii)  take all necessary steps to prevent title to the 

goods from passing to the landlord of such land or 
building.

 (iii) 

 

forthwith inform us in writing of such affixation and 
of the address of the land or building concerned.

 

The Purchaser warrants to repair and make good 
any damage caused by the affixation of the goods 
to or their removal from any land or building and to 
indemnify us against all loss damage or liability we 
may incur or sustain as a result of affixation or removal.

  (i)   in the event that, before property in the goods 

has passed to the Purchaser under paragraph (2) 
hereof, the goods or any of them are lost, stolen, 
damaged or  destroyed :-

  (ii)  the Purchaser shall forthwith inform us in writing 

of the fact and circumstances of such loss, theft, 
damage or destruction.

  (iii)  the Purchaser shall assign to us the benefit of any 

insurance claim in respect of the goods so lost, 
stolen, damaged or destroyed.

14.   NON-PAYMENT

If the Purchaser shall fail to make full payment for the goods 
supplied hereunder within the time stipulated in clause 4 
hereof or be in default of payment for any other reason then, 
without prejudice to any of our other rights hereunder, we 
shall be entitled to stop all deliveries of goods and materials 
to the Purchaser, including deliveries or further deliveries of 
goods under this contract.  In addition we shall be entitled to 
terminate all outstanding orders.

15.   VALUE ADDED TAX

All prices quoted are exclusive of Value Added Tax which 
will be charged at the rate ruling at the date of despatch of 
invoice.

16.   TRADE SALES ONLY

We are only prepared to deal with those who are not 
consumers within the terms of the Unfair Contract Terms 
Act 1977, the Sale of Goods Act 1979 and the Supply of 
Goods and Services Act 1982.  Accordingly any person who 
purchases from us shall be deemed to have represented that 
he is not a consumer by so purchasing.

17.   JURISDICTION

The agreement is subject to English law for products 
delivered in England and Scottish law for products delivered 
in Scotland and any dispute hereunder shall be settled in 
accordance therewith dependent upon the location.

18.   PRODUCT DEVELOPMENT

Gledhill have a policy of continuous product development 
and may introduce product modifications from time to time.

TERMS AND CONDITIONS

Содержание Stainless Lite HP Indirect 180-400 litres

Страница 1: ... Models covered in this manual Stainless Lite HP SOL Indirect 180 400 litres Stainless Lite HP Indirect 180 400 litres Stainless Lite HP Slimline 180 210 litres StainlessLite HP Unvented cylinders specifically designed to work with a heat pump ...

Страница 2: ...nsure they do not play with the appliance This information is provided to assist generally in the selection of equipment Responsibility for selection and specification of our equipment must however remain that of our customer and any experts or consultants concerned with the installation s Please note that we do not therefore accept any responsibility for matters of designselectionorspecification ...

Страница 3: ...RV setting 3 bar Expansion vessel charge pressure 3 bar Expansion relief valve setting 4 75 bar Opening pressure of P T Relief Valve 6 bar Opening temperature of P T Relief Valve 92 95 C Energy cut out thermostat setting 85 C Max working pressure Primary heat exchanger Indirect models 6 bar Max working pressure Solar heat exchanger Solar models 10 bar Immersion heater rating 3kW 240V AC All cylind...

Страница 4: ...4 35 2 x 24 Expansion vessel initial charge pressure bar 3 3 3 3 3 Height A mm 1305 1495 1745 1992 2030 Diameter B mm 550 550 550 550 630 22mm secondary return C mm 1127 1377 1577 1592 22mm compression cold feed D mm 442 442 522 522 557 P T valve E mm 1053 1241 1491 1720 1784 22mm solar return bottom coil F mm 223 223 223 223 238 22mm solar flow bottom coil G mm 352 352 472 472 548 28mm primary re...

Страница 5: ...ef valve setting bar 4 75 4 75 4 75 4 75 4 75 Temperature setting P T valve C 95 95 95 95 95 Pressure setting P T valve bar 6 0 6 0 6 0 6 0 6 0 Expansion vessel size volume litres 18 24 24 35 2 x 24 Expansion vessel initial charge pressure bar 3 3 3 3 3 Height mm 1305 1493 1743 1990 2030 Diameter mm 550 550 550 550 630 Hot Supply A mm 1352 1540 1790 2035 2080 P T valve B mm 1047 1235 1485 1731 178...

Страница 6: ... 3 Expansion relief valve setting bar 4 75 4 75 Temperature setting P T valve C 95 95 Pressure setting P T valve bar 6 0 6 0 Expansion vessel size volume litres 18 24 Expansion vessel initial charge pressure bar 3 3 Height A mm 1790 1970 Diameter B mm 475 475 22mm secondary return C mm 1540 22mm compression cold feed D mm 283 283 P T valve E mm 1535 1706 22mm solar return F mm 22mm solar flow G mm...

Страница 7: ...ar coil flow from panel 22mm compression 12 Solar thermostat pocket 13 Drain off Part G3 loose components supplied in a separate box A Combination inlet group incorporating pressure reducing valve strainer check valve balance cold take off point expansion relief valve and expansion vessel connection points B Potable expansion vessels c w flexible hose and wall bracket C Tundish D Dual control ther...

Страница 8: ...r 1 BSP 3kW Part G3 loose components supplied in a separate box A Combination inlet group incorporating pressure reducing valve strainer check valve balance cold take off point expansion relief valve and expansion vessel connection points B Potable expansion vessels c w flexible hose and wall bracket C Tundish D Dual control thermostat and combined overheat thermostat E Two port 28mm zone valve fo...

Страница 9: ...mponents supplied in a separate box A Combination inlet group incorporating pressure reducing valve strainer check valve balance cold take off point expansion relief valve and expansion vessel connection points B Potable expansion vessels c w flexible hose and wall bracket C Tundish D Dual control thermostat and combined overheat thermostat E Two port 28mm zone valve for primary circuit F Wiring j...

Страница 10: ...erateshouldbetestedandadjustedsothat it achieves a minimum of 60 C in order to comply with the Legionella pasteurisation requirements The technical details of the Stainless Lite HP models are listed in table 1 Important notes 1 All Stainless Lite HP models are suitable for both open vented and sealed primary systems 2 Whenusedwithasealedprimaryheatingsystem theheatpumpmustincorporate its own over ...

Страница 11: ...o Stainless Lites are coupled together the secondary inlet and outlet pipes must be balanced The units must be fitted on the same level Note No valves must be fitted between the expansion vessel and the storage cylinder s INSTALLATION INSTALLATION The pipe connecting the boiler flow to the appliance must not be less than 22mm copper or equivalent Further guidance on converting heat loss limits to ...

Страница 12: ...ms Number of bathrooms and shower rooms Without solar heating system 1 With solar heating system 2 1 3 1 bathroom HP180INDSOL HP180IND HP180INDSOL FA 50m2 2 3 1 bathroom 1 shower room HP180INDSOL HP180IND HP210INDSOL FA 65m2 2 3 1 bathroom 2 shower rooms HP180INDSOL HP180IND HP250INDSOL FA 85m2 2 4 2 bathrooms 1 shower room HP210INDSOL HP210IND HP300INDSOL FA 110m2 2 4 2 bathrooms 2 shower rooms H...

Страница 13: ...l 210HP Slim 250HP 250HP Sol 300HP 300HP Sol 400HP 400HP Sol 4 Pressure loss bar for each flow rate above in the available coil combinations 180HP 0 010 0 027 0 053 0 092 0 143 0 207 0 286 0 381 0 491 0 618 0 763 0 927 1 109 1 310 1 532 1 774 180HP Sol 0 003 0 008 0 017 0 031 0 049 0 073 0 103 0 140 0 183 0 234 0 292 0 359 0 434 0 518 0 612 0 715 180HP Slim 0 004 0 010 0 018 0 030 0 044 0 062 0 08...

Страница 14: ...ashing Anytypeofshowermixingvalve can be used as long as both the hot and cold supplies are mains fed However all mains pressure systems are subject to dynamic changes particularly when other hot and cold taps showers are opened and closed which will cause changes in the water temperature at mixed water outlets such as showers For this reason and because these are now no more expensive than a manu...

Страница 15: ...the discharge be of metal and a Be at least one pipe size larger than the nominaloutletsizeofthesafetydeviceunless its total equivalent hydraulic resistance exceeds that of a straight pipe 9m long i e discharge pipes between 9m and 18m equivalent resistance length should be at leasttwosizeslargerthanthenominaloutlet size of the safety device between 18 and 27m at least 3 sizes larger and so on Ben...

Страница 16: ...d They must not be changed removed or by passedanditisessentialthatonlygenuinereplacementpartssuppliedorapproved by Gledhill Building Products Limited are used This includes the immersion heaters whichmustincorporateanenergycut out Allpartsareavailabletoapprovedinstallers from Gledhill Building Products Limited Sycamore Estate Squires Gate Blackpool Telephone 01253 474402 Combination Inlet Group C...

Страница 17: ...ons where water quality is poor ensuring improved performance and extended operational life This can be purchased as an extra from your Gledhill depot under code number SH002 INSTALLATION INSTALLATION Theoperationoftheboostimmersionheatercan also be controlled by means of an independent time switch as shown schematically below The ON time settings on the immersion heater should be between 30 60 mi...

Страница 18: ...roptimumefficiency i e COPofaheatpump lowtemperatureunderfloorheating system should be considered The heat pumps normally operate at lower temperature difference between flow and return compared with the traditional boilers and therefore when sizing the pipework heat pump manufacturers recommendations should be taken into account Safety Stainless Lite HP is fitted with a combined temperature and p...

Страница 19: ...tem A heat pump selected must be suitable for use in a sealed heating system which may have working pressure of up to 3 0bar and it must be fitted with an overheat temperature cut out device Unvented i e sealed primary circuits may be filled or replenished by means of a temporary connection between the circuit and a water supply pipe provided a WRC Listed double check valve and filling loop or som...

Страница 20: ...nvented Cylinder T Anti Gravity Check Valve Pressure Relief Valve Anti Gravity Check Valve Standard 10 way wiring junction box Not supplied This valve must be fitted on the return to the solar panels and be suitable for higher temperatures operation Not supplied No isolation valve should be installed between the solar circuit and the safety valve pressure relief valve Solar Controller Schematic Sh...

Страница 21: ...Page 21 INSTALLATION INSTALLATION Typical schematic wiring diagram for Stainless Lite HP heating system Please refer to the heat pump manufacturers installation instructions ...

Страница 22: ... damage unless the appliance is adequately flushed and refilled with the mains water immediately on completion of the disinfection procedure Damage caused through a failure to do this adequately will not be covered by the warranty For the above reasons we recommend the use of a non chlorine dased disinfectant such as Fernox LP Sterox as manufactured by Cookson Electronics when carrying out disinfe...

Страница 23: ...ssure in the system stabilises This is quite normal with these types of systems and does not indicate a fault In some areas the water will initially appear cloudy but will quickly clear when left to stand This is nothing to be concerned about and is due to aeration of the water WARNING Ifwaterisseenflowingthroughthetundish thisindicatesafaultcondition which needs action If the discharge is hot and...

Страница 24: ...ves are free from obstruction and blockage and are not passing any water 5 Check the condition and if necessary descale the heat exchangers in hard water areas 6 Check that water pressure downstream of pressure reducing valve is within the manufacturers limits 7 Check operation of motorised valve 8 Check the pressure on the air side of the expansion vessel This must be done when the volume in the ...

Страница 25: ...ed from the mains before re setting the energy cut out If the immersion heater s need replacing this should be done with the units supplied from Gledhill Building Products Limited Same day despatch to approved installers can be arranged by telephoning 01253 474402 Discharge From Relief Valves If cold water is discharging from the expansion relief valve into the tundish check the pressure on the ex...

Страница 26: ...out Re set END YES YES YES YES YES YES YES NO NO NO NO NO NO NO FAULT Poor Water Flow at Hot Taps Water service check by supply company required Clean or replace strainer as appropriate Service replace PRV as appropriate START END Is incoming mains supply flow pressure adequate Is in line strainer in combination valve clean YES YES YES YES NO NO NO Clear obstructions Is system free from restrictio...

Страница 27: ...antity Stock Code No 1 3kW immersion element 1 SH001 2 22mm 90 compression elbow c w drain 1 SF003 3 Lift up pressure and temperature relief valve 6 bar 92 95 C 1 SG017 4 Inlet group set at 3 bar c w expansion relief valve set at 4 75 bar 1 SG010 5 flexible hose 1 SG003 6 18 litre expansion vessel 1 XG191 7 24 litre expansion vessel 1 XG192 8 Wall mounting bracket for 18 24 litre expansion vessel ...

Страница 28: ...Stourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated 10 12 l m Over 20 l m 5 6 or 8 l m 2 tap half open Fitted with regulator Unregulated 4 Fixing Options For Taps Mixers 1 MK Range Combined Regulators Aerator forscrewingontoTaps Mixerswithinternal ore...

Страница 29: ...e lifting ensure you have a good hold e Taking the lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the weight and of the items listed within this assessment Make sure you and any others helping know the route you intend to take that it is clear of any obs...

Страница 30: ...Page 30 NOTES ...

Страница 31: ...Page 31 NOTES ...

Страница 32: ...Max 300 mg l in total 9 2 5 Whereappropriatetheunithasbeenregularlymaintainedasdetailedintheinstallationandserviceinstructions 9 2 6 Defects caused by corrosion or scale deposits are not covered by any Guarantee 9 2 7 Where we agree to rectify any defect we reserve the right to undertake the work on our own premises 9 2 8 We will not accept any labour charges associated with replacing the unit or ...

Страница 33: ...l hold the goods in a fiduciary capacity for us and shall store the same separately from any other goods in the Purchaser s possession and in a manner which enables them to be identified as our goods ii the Purchaser shall immediately return the goods to us should our authorised representative so request All the necessary incidents associated with a fiduciary relationship shall apply d the Purchas...

Страница 34: ...Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet C All appropriate pipes have been insulated up to 1 metre or the point where they become concealed Yes UNVENTED SYSTEMS ONLY KHUH LV WKH SUHVVXUH UHGXFLQJ YDOYH VLWXDWHG LI WWHG What is the pressure reducing valve setting bar DV D FRPELQHG WHPSHUDWXUH DQG SUHVVXUH UHOLHI YDOYH D...

Страница 35: ...ame Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date Engineer name Company name Telephone No Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Comments...

Страница 36: ...R code using your smart phone app or go to www gledhill spares net On expiry of your initial warranty period Gledhill Response Limited would be pleased to provide further customer support with a range of services including Low cost annual repair and maintenance contracts direct from Gledhill Annual servicing and safety checks Expert response to out of warranty breakdowns at fixed charges Please ca...

Отзывы: