1.0 DESIGN
1.1 INTRODUCTION
Remote
F&E
Cistern
BM
A-Class
SP
Boiler
Cold feed
Open Vent
Heating Circuit
Hot Out
Mains Cold In
Components fitted
within appliance case
Expansion Vessel
Pressure Gauge/Filling Loop
Pressure Gauge Relief/Safety Valve
Optional
sealed system
kit
3 port divertor valve
Automatic
bypass valve
Summer use towel
rail blanked connection
The Building Regulations L1A: New dwellings/L1B: Existing dwellings and the
requirements set out in the Domestic Heating Compliance Guide specify that “where
the mains water hardness exceeds 200ppm provision should be made to treat the feed
water to water heaters and the hot water circuit of combination boilers to reduce the
rate of accumulation of lime scale”.
To comply with this requirement the hardness of the mains water should be checked by
the installer and if necessary the optional factory fi tted in-line scale inhibitor should be
specifi ed at the time of order for hardness levels between 200 and 300 ppm (mg/l).
Where the water is very hard ie 300ppm (mg/l) and above the optional polyphosphate
type, inhibitor should be specifi ed at the time of order. However, this will need to be
fi tted by the installer at a suitable point in the cold water supply to the appliance.
If scale should ever become a problem the plate heat exchanger is easily isolated and
quickly replaced with a service exchange unit which can be obtained at a nominal
cost from Gledhill.
The A.C.B. also incorporates the facility to operate the primary pump for a few seconds
every few days when the heating is not being used (to reduce the likelihood of the
pumps sticking) as well as providing a primary pump overrun facility for the boiler.
Any sealed system automatic boiler designed to operate on an 82
0
C fl ow and a 71
0
C
return up to a
maximum of 35kW can be linked to any suitable model of BoilerMate
A-Class and the deciding factor is the space heating and the hot water requirements
of a dwelling. See Section 1.2 Technical Data for further details.
The BoilerMate A-Class is supplied complete with ‘Switch’ which will provide a 6kW
electrical emergency backup in case of failure of the main heat source. See section
1.3 System Details for further information.
The heat losses from thermal stores should not be directly compared with heat losses
from unvented or vented cylinders because
they are treated differently in SAP. The SAP
calculator takes account of the type of store
and various correction factors are included to
refl ect the different ways that the hot water and
heating operates.
For further information please request a copy
of the SAP 2005 Data Sheet which provides
the information required to produce SAP
calculations for all Gledhill Thermal Storage
products.
Gledhill are part of the ‘Benchmark’ scheme and
a separate commissioning/service log book is
included with the product.
A 15mm connection is provided on the primary
return on all units to allow for the provision
of a pumped summer use towel rail circuit if
required (see page 16 for further details)
Note -The BoilerMate SP is a SYSTEM
appliance and only requires a basic boiler
without a pump. If a system boiler is
chosen this will present wiring/operational
diffi culties as well as incurring extra cost