1
!
I. S afety G uida n c e f or u ser
II. Precautions
Thank you for choosing the DSL 30N boiling hot water unit.
To enjoy the service of this unit, please read this manual
carefully and follow the instruction.
1.The unit shall only be installed and maintained by an authorized service provider or a qualified
electrician. We urge you to read all of the instructions thoroughly before installation or operation.
The manufacturer will not be liable for any damages caused by faulty installation..
2.Warning: The unit must be properly earthed.
3.Before switching the power on, make sure that all plumbing pipes are connected, the unit is filled
with water and water flows from the outlet.
4.If the power supply cable is damaged it must be replaced by an authorized electrical contractor.
5.The heater unit is designed to be installed for indoor use only and should never be installed in an
exposed area.
6.The unit should not be installed in a place subject to freezing.
7.This heater is not intended to be operated by children, or mentally impaired personnel, unless under
adult supervision and guidance.
8.The outlet water temperature is delivered at up to 95
℃,
avoid contact with hot water to prevent
scalding.
9.This boiling water heater is not intended for any other use than to provide boiling water 24hrs a day.
10.Children are not allowed to play with the water unit.
1.This hot water unit should be installed on a separate circuit 35amp 240V~, 50Hz power supply.
2.The water heater should be properly earthed.
3.After installation, it is important to fill the unit with water before switch the power on, so as to
prevent it from dry-burning and damage.
4.The power switch for the heater should be installed in a dry place.
5.Damaged power cables should be replaced by qualified electrical contractor or service provider.
6.If the unit is to be left unattended for an extended period of time in a cold region, draining the
water tank is recommended to avoid freezing.
7.In the event of a fault from the heater, contact your authorized service provider.
8.An earth leakage switch with a 30mAmp circuit-breaker is required to install at the main
switchboard.
9.Only use tap supplied with the unit for delivery of boiling water.
10.Switch off the power to the water heater when you are not using water heater for long time.
11.For sterilization, at least 90% of the stored water is heated to
for at least one single period of
not less than 32 min in each 7 day period.
60
℃
Содержание DSL-30N
Страница 8: ...www gleamoushotwater com au ...