19
GB
Pre-Delivery Instructions
Please take the time to read this booklet carefully, as it will provide you with the information
you will need to ensure the safe, secure, and timely installation of your new spa. The following
sections are guidelines on how to prepare for delivery and set-up of your new spa. Specifically
covered are site selection, delivery access, ground preparation, and electrical requirements.
Remember to carefully read the Owner’s Manual that accompanies your spa. These items,
along with other valuable information, included in the Owner’s Package which can be located
in the equipment compartment of your spa.
Manufacturer reserves the right to change features, specifications and design without notification
and without incurring any obligation.
In most cities and counties, permits will be required for the installation of electrical circuits or
the construction of exterior surfaces (decks and spa enclosures). In addition, some communities
have adopted residential barrier codes which may require fencing and/or self-closing gates on
the property to prevent unsupervised access to a pool (or spa) by children under 5 years of
age. Your Spa is equipped with a locking cover that meets the ASTM F1346-91 Standard for
Safety Covers (optional) and as a result, is usually exempt from most barrier requirements.
As a general practice, your local Building Department will inform you of any applicable barrier
requirements at the time a permit is obtained for the installation of an electrical circuit. Your
dealer can provide information on which permits may be required.
Содержание MySpa 213
Страница 1: ...MySpa Istruzioni di preinstallazione Pre Delivery Instructions MySpa ...
Страница 2: ......