background image

15 |

P a g e

GC 229 AND 230 – PROGRAMMING

A. To Program GC229 OR GC230 to a GC-136 Receiver

1. Turn on the GC-136 (Leave it on if already on).
2. Press the

PROGRAM

button on the GC-136 (the LED will start blinking).

3. Press the

STOP

button on the GC-136 (The LED will be on solid).

4. Press the desired

UP

button on the GC229 OR GC230.

5. Extend or Retract the awning to verify that the unit is working properly.

THIS CONCLUDES THE BRIEF OVERVIEW OF SOME OF GIRARD SYSTEMS
PRODUCTS. PLEASE CONSULT THE CD COPY OF THE MANUALS FOR
ANY INFORMATION NOT COVERED IN THIS HANDOUT. FOR ANY OTHER
TECHNICAL SERVICE QUESTIONS PLEASE FEEL FREE TO CALL GIRARD
SYSTEMS SERVICE LINE MONDAY THROUGH FRIDAY 7AM TO 5PM PST.
THE TOLL FREE NUMBER IS (800)382-8442.

Содержание NEWMAR SERVICE SCHOOL

Страница 1: ...NEWMAR SERVICE SCHOOL TRAINING INFORMATION GUIDELINE FOR FEBRUARY 2013...

Страница 2: ...2 P a g e OUR PRODUCTS NOVA DUAL PITCH AWNING G 2000 G 1500...

Страница 3: ...3 P a g e G 2085 G 5000...

Страница 4: ...4 P a g e G LINKS...

Страница 5: ...R TO RUN WHEN THE AWNING IS CLOSED THIS CAN SUBSTANTIALLY REDUCE THE LIFE OF THE MOTOR 1 The AC motors used in Girard Systems awnings are reversible Any reference made to the motor limit switches in t...

Страница 6: ...extension For proper adjustment set limit switch to stop the motor just before the arms lock This will expose about an 1 4 gap at the elbow B ADJUSTING PITCH and ARM Elbow HEIGHTH NOTE This adjustmen...

Страница 7: ...arm location inside the cassette Rotate the bolt counter clockwise to LOOSEN or lower the arm location inside the cassette 4 NOTE After retightening the nylon nuts the arms will raise slightly higher...

Страница 8: ...1 Using a 19mm open end wrench rotate the bolt counter clockwise to LOOSEN or lower the pitch If the pitch is lowered too far you may turn the bolt clockwise or TIGHTEN to raise the pitch DO NOT OVERT...

Страница 9: ...extended If the system does not operate correctly under these conditions you may A Provide sufficient power from your panel B Replace the anemometer in the electronics system with a Motion Sensor D A...

Страница 10: ...from the spring support and carefully release all tension Use channel locks on the special tool to maintain the tension while repositioning the ratchet handle 5 Now you are ready for tensioning Take u...

Страница 11: ...ng screws into the cassette 8 Now we are ready for tensioning Take up fabric slack Apply 7 full turns or 14 half turns follow arrows on end plate to tension 9 Re attach center screws into spring suppo...

Страница 12: ...rail 3 Remove old fabric and insert new fabric This operation is completed much easier with two people 4 Close awning making sure fabric is rolling up straight evenly spaced on both sides of tube Appl...

Страница 13: ...6 1 1 Turn on power to GC136 2 Verify which Button of the GC136 functions as DOWN button Opens the Awning 3 Press simultaneously the STOP and DOWN button of the GC136 for at least 6 seconds The Green...

Страница 14: ...e GC116I to a GC 136 Receiver 1 Turn on the GC 136 and the GC116I Leave them on if already on 2 Press the PROGRAM button on the GC 136 the LED will start blinking 3 Press the STOP button on the GC 136...

Страница 15: ...solid 4 Press the desired UP button on the GC229 OR GC230 5 Extend or Retract the awning to verify that the unit is working properly THIS CONCLUDES THE BRIEF OVERVIEW OF SOME OF GIRARD SYSTEMS PRODUCT...

Страница 16: ...16 P a g e...

Отзывы: