NOTE:

Solis three phase inverters integrate neutral connectioin point. However, with or 

without neutral connected won’t affect the normal operation of inverter itself. 

Please refer to the local grid requirement if need neutral cable connected.  

The ground wire can be connected to the grounding hole on the right side of 

the inverter heat sink. 

   C)  R

emove

 the 4 screws on the AC terminal cover and remove the cover (in figure 5.18). 

        R

emove

 the screw under terminal slide and pull out the terminal ( in figure 5.19).

Figure 5.18 Cover

Cable specification

Copper clad aluminum / 

Aluminum Alloy cable 

25

22~32

27

Copper-cored 

cable 

Cable outer diameter 

(mm

)

Traverse cross 

sectional area 

(

mm

 )

2

R

ange

Recommended

35

16~35

25~35

NOTE:

Prepare M6 OT terminals.

A)  Strip the end of AC cable insulating jacket about 90mm then strip the end of each wire . 

The steps to assemble the AC grid terminals are listed as follows:

For all AC connections, 16- 35mm   105 

 cable is 

accept

 to be used. 

2

Please make sure the resistance of cable is lower than 1.5 ohm. If the wire is longer than 
20m, it's recommended to use 25-35mm

²

 cable. Refer to local electrical codes for wire sizing.

5.3.3 AC side connection

R

ange

Recommended

Figure 5.17 Strip AC cable

L2 (insulation stripping length) is 2mm-3mm longer than L1 (OT cable terminal 

crimping area)  

5.

 

Installation

5.

 

Installation

 

 

B)  Strip the insulation of the wire core, insert into the cable crimping area of the OT terminal,

 

 

then use a hydraulic crimp tool to crimp it firmly. The wire must be covered with heat shrinkable
tube  or  insulating  tape  .  When  using  the  heat  shrinkable  tube  sleeve  the  heat  shrinkable
tube over the wire before crimping the OT terminal.

    
D)  Insert the cable through cap nut, water proof

 bushing

 and AC terminal cover into the AC

terminal and use a socket

 

wrench to tight the screws. The torque is 4-6Nm ( as shown in 

figure 5.20).

Figure 5.19 Disassemble AC terminal cover

Figure 5.20a Connect cable to AC terminal

.20.

L2

L1

PE

N

L

NOTE:

Содержание Solis

Страница 1: ...blem on the inverter please find out the inverter S N and contact us we will try to respond to your question ASAP Ginlong Technologies Co Ltd No 57 Jintong Road Binhai Industrial Park Xiangshan Ningbo...

Страница 2: ...allation 5 1 Select a Location for the Inverter 5 2 Mounting the Inverter 5 3 Electrical Connections 6 Start and Stop 6 1 Start the Inverter 6 2 Stop the Inverter 11 11 13 15 27 27 27 5 3 2 DC side co...

Страница 3: ...Settings Technicians Only 7 5 1 Select Grid Standard 7 5 2 Grid ON OFF 8 Maintenance 9 Trouble Shooting 10 Specification 31 31 32 32 32 34 34 35 41 43 48 7 4 2 Running Message 31 7 5 3 Clear Energy 3...

Страница 4: ...ous injury or death Improper use may result in potential electric shock hazards or burns This manual contains important instructions that should be followed during installation and maintenance Please...

Страница 5: ...ce technician only Warranty may be voided if any unauthorized removal of cover CAUTION The surface temperature of the inverter can exceed 75 C 167 F To avoid risk of burns DO NOT touch the surface whe...

Страница 6: ...e Down keys The two line Liquid Crystal Display LCD is located on the front panel of the Inverter which displays the following information 1 Inverter operation status and data 2 Service messages for o...

Страница 7: ...osive materials to avoid damage to the inverter enclosure Inspect packaging regularly If packaging is damaged wet pest damage etc repackage the inverter immediately Store the inverter s on a at hard s...

Страница 8: ...can be mounted to the wall or metal strut of module The mounting holes should be consistent with the size of the bracket or the dimensions shows below 1 According to the figure 5 2 select the mountin...

Страница 9: ...see figure 1 2 are listed in Table 5 1 All electrical installations must be in accordance with all local and national standards Table 5 1 Electrical connection symbols GRID COM1 Connecting terminal of...

Страница 10: ...istance of the grounding terminal we recommend that the External grounding terminal should be coated with silica gel or paint for protection after the installation of the grounding cable Important Fig...

Страница 11: ...verter Asmall click will confirm connection as shown by the red area in Figure 5 16 Cable type Outside diameter of cable mm 4 0 6 0 5 5 9 0 Traverse area mm Range Industry generic PV cable model PV1 F...

Страница 12: ...listed as follows For all AC connections 16 35mm 105 cable is accept to be used 2 Please make sure the resistance of cable is lower than 1 5 ohm If the wire is longer than 20m it s recommended to use...

Страница 13: ...vice A There are 3 communication terminals for Solis inverter COM1 COM3 are all for RS485 communication COM1 is a 4 pin connector which matches with the Wi Fi or GPRS wireless communication products C...

Страница 14: ...eter 9mm internal resistanc 1 5 10m and shielded RJ45 connectors are recommended Figure 5 24 RJ45 port and Terminal board 5 Installation 5 Installation Steps for connecting the RS 485 cable RS485A1 RS...

Страница 15: ...When both the DC and the AC sides supply to the inverter it will be ready to generate power Initially the inverter will check both its internal parameters and the parameters of the AC grid to ensure...

Страница 16: ...ows input 01 voltage value I_DC1 Shows input 01 current value V_A Shows the grid s voltage value I_A Shows the grid s current value Status Shows instant status of the Inverter Power Shows instant outp...

Страница 17: ...4 1 Alarm Message The display shows the latest alarm messages see Figure 7 6 Screens can be scrolled 100 manually by pressing the UP DOWN keys Press the ESC key to return to the previous menu Alarm00...

Страница 18: ...9D 55 Figure 7 14 Communication Data 7 4 7 Daily Record The screen shows history of changing settings Only for maintenance personnel The screen shows the internal data of the Inverter see Figure 7 15...

Страница 19: ...1 173 236V UN G F1 47 49 5Hz 57 59 5Hz UN G V1 T 0 1 9s UN G F1 T 0 1 9s UN G V2 132 219V UN G F2 47 49Hz 57 59Hz UN G V2 T 0 1 1s UN G F2 T 0 1 9s These two functions are applicable by maintenance pe...

Страница 20: ...9 IgZero_COMP Set 10 PI Set 11 IgADCheckPRO Set 12 NoSmallPulse Set This function is applicable by maintenance personnel only 7 5 8 STD Mode Settings This function is applicable by maintenance person...

Страница 21: ...setting Press the ESC key to cancel changes and returns to the previous menu Figure 7 22 7 Operation 7 5 13 Fan Test Figure 7 24 Fan Test have the submenu shown below This function is applicable to ma...

Страница 22: ...l lead to frequent false alarms or malfunctions Solis is not responsible for any further damages caused by unauthorized modifications The fan and filter should be regularly cleaned so as to improve th...

Страница 23: ...inverter is designed in accordance with the relevant international grid tie standards along with and safety and electromagnetic compatibility requirements Before delivering to the customer the invert...

Страница 24: ...t with permission from utility Check LCD voltage reading may be a bad measurement circuit Test DC Switch ON Check grid standard Replace inverter 9 Troubleshooting Alarms Cause Solution Inverter detect...

Страница 25: ...ar irradiance reduces and confirm the string current is less than 0 5A with a clip on ammeter and then turn off the DC switches Please note that any damages due to wrong operations are not covered in...

Страница 26: ...S 5 years Extand to 20 years IEC 62109 1 2 IEC 61000 6 2 4 10 Specification Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT number Max input strings number Rated grid v...

Страница 27: ...5 60 3 PE 480 Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT number Max input strings number Rated grid voltage Volts Power Factor at rated output power Operating freq...

Отзывы: