5. Operation
5. Operation
After setting the language, press "ESC" to access the Home Page.
Figure 5.3 Home Page
Solar Power: When solar power is generated an arrow
,
indicates the direction of the power flow, and the value is shown
above the arrow in kilowatts (kW).
Battery: When the battery is connected successfully, it will
display “COM OK”, the battery SOC arrow and flow will also be
shown. If the battery is not connected it will show “COM FAIL”.
House Loads: Loads connected to the AC Grid port that will
shutdown in the event of a grid outage.
KWH
2
.
526
External Meter: When the smart meter is connected successfully,
it will display "RS485 OK", otherwise it will say"RS485 Fail".
Critical Loads: Loads connected to the AC backup port which will
be supported by battery and solar during a grid outage.
Grid: The arrow and value indicate the export/import power of
the system to/from the utility.
On the Home Page,
Press "ESC" : View the yield data on monthly bar charts.
Then use "UP" and "DOWN"
to change the date and "ENT" to move the cursor.
Press "UP" or "DOWN": View different status on the top left of the Home Page.
Press "ENT": Enter the main menu.
KWH
2
.
526
COM
OK
5.2 Main Menu
There are four submenus in the Main Menu:
1. Information 2. Settings 3. Advanced Information 4. Advanced Settings
Figure 5.4 Main Menu
Settings
Menu
2015-02-23 19 35
Information
Settings
Advanced Information
Advanced Settings
5.3 Information
In the Information section, operating data and information data can be viewed.
Subsections of Information menu include:
1.General Info 2.System Info 3.Energy Records 4.BMS Info 5.Meter Info
Settings
Information
2015-02-23 19 35
General Info
System Info
Energy Records
BMS Info
Meter Info
Figure 5.5 Information
.22.