background image

Solis three phase inverter does not require any regular maintenance. However, clean the 

heat-sink will help inverter dissipating heat and increase the life time of inverter.

The dirt on the inverter can be cleaned with a soft brush.

CAUTION: 

Do not touch the surface when the inverter is operating. Some parts may be hot 
and cause burns. Turn OFF your inverter (refer to Section 5.2) and let it cool 
down before you do any maintenance or cleaning of inverter.

The LCD and the LED status indicator lights can be cleaned with  cloth if they are too 

dirty to be read. 

NOTE: 

Never use any solvents, abrasives or corrosive materials to clean the inverter.

8. Trouble Shooting

The inverter is designed in accordance with the most important international grid-tied 

standards and safety and electromagnetic compatibility requirements. Before delivering to 

the customer, the inverter has been subjected to several tests to ensure its optimal operation 

and reliability.

In case of failure, the LCD screen will display an alarm message. In this case, the inverter 

may stop feeding into the grid. The failure descriptions and their corresponding alarm 

messages are listed in Table 8.1:

.29.

.28.

7. Maintenance

8. Trouble Shooting

Alarm Message

OV-G-V

UN-G-V

OV-G-F

UN-G-F

G-IMP

NO-GRID

OV-DC

OV-BUS

UN-BUS

GRID-INTF.

INI-FAULT

OV-TEM

GROUND-FAULT

Failure description

Over grid voltage

Under grid voltage

Over grid frequency

Under grid frequency

High grid impedance

No grid voltage 

Over DC voltage 

Over DC bus voltage

Under DC bus voltage

Grid interference

Initialization system fault

Over Temperature 

Ground fault

Table 8.1 Fault message and description

NOTE: 

If the inverter displays any alarm message as listed in Table 8.1; please 
turn off the inverter (refer to Section 5.2 to stop your inverter) and wait for 5 
minutes before restarting it (refer to Section 5.1 to start your inverter). If the 
failure persists, please contact your local distributor or the service center. 
Please keep ready with you the following information before contacting us.

1.  Serial number of the Inverter;

2.  The distributor/dealer of the Inverter (if available);

3.  Installation date.

4.  The description of problem (i.e. the alarm message displayed on the LCD and the status 

    of the LED status indicator lights. Other readings obtained from the Information submenu 

    (refer to Section 6.2) will also be helpful.);

5. PV array’s configuration (e.g. number of panels, capacity of panels, number of strings, etc.);

6. Your contact details.

ILeak-FAULT

Relay-FAULT

DCinj-FAULT

High Grid leakage current

Relay check fault

High DC injection current

Содержание Solis-10K

Страница 1: ...PV Grid Tie Inverter Installation and Operation Manual Ver 2 6 Solis Three Phase Inverter...

Страница 2: ...ont Panel Display 3 2 LED Status Indicator Lights 3 3 Keypad 3 4 LCD 4 Installation 4 1 Selecting Location for the Inverter 4 2 Mounting the Inverter 4 3 Electrical Connections 5 Start and Stop 5 1 St...

Страница 3: ...240V three phase grid system All 6 models are transformerless topology grid tie PV inverter Figure 1 1 Front side view 3 Figure 1 2 Bottom side view 6 Operation 6 1 Main Menu 6 2 Information 6 3 Sett...

Страница 4: ...WARNING symbol indicates important safety instructions which if not correctly followed could result in serious injury or death Improper use may result in potential electric shock hazards or burns This...

Страница 5: ...The inverter must be installed according to the instructions stated in this manual 5 The inverter must be installed according to the correct technical specifications 6 To startup the inverter the Gri...

Страница 6: ...fault indications 8 9 To select a location for the inverter the following criteria should be considered To avoid over heating ambient air temperature MUST be considered when choosing the inverter ins...

Страница 7: ...500mm 500mm 500mm 500mm Figure 4 1 Inverter Mounting clearance 4 Installation 4 Installation Inverter should be mounted in a vertical position as shown in Figure 4 3 The steps to mount the inverter on...

Страница 8: ...itting the hooks into the slot of the bracket Use M4 14 stainless steel screws at holes E and F in Figure 4 to secure the mounting hooks to the rear of the inverter Figure 4 4 Wall Mount Bracket The e...

Страница 9: ...4 8 Insert the Wire into the Connector Cap nut and contact pin Figure 4 10 Connector with Cap nut Screwed on Figure 4 11 Connect the DC Connectors to the Inverter v Then connect the DC connectors to t...

Страница 10: ...of AC wire about 8mm Insert the cable through the jacket and cap nut of connector then insert the wires to the grid terminal and tighten the screws on the connector as shown in Figure 4 13 Please try...

Страница 11: ...Solis 15K Figure 5 1 Company Name and Inverter Model on LCD 3 When both the DC and the AC grid sides supply to the inverter it will be ready to generate power Initially the inverter will check both i...

Страница 12: ...n by scrolling up or down 6 Operation Pressing the ESC key returns to the Main Menu Pressing the ENTER key to lock Figure 6 2 a or unlock Figure 6 2 b the screen V_DC1 350 8V I_DC1 5 1A V_DC2 350 8V I...

Страница 13: ...cation purpose The address number can be assigned from 01 to 99 see Figure 6 4 The default address number of Solis three phase inverter is 01 6 Operation 23 22 6 4 Advanced Info Technicians Only Selec...

Страница 14: ...E Before to using this function please set GRID OFF to stop inverter refer to Section 6 5 2 NOTE The inverter is customized according to the local standard before shipping to the customer The User Def...

Страница 15: ...ues of the User Def standard are some reference values They are not indicating the values of the standard you are currently using Press the UP DOWN keys to scroll through items Press the ENTER key to...

Страница 16: ...Trouble Shooting Alarm Message OV G V UN G V OV G F UN G F G IMP NO GRID OV DC OV BUS UN BUS GRID INTF INI FAULT OV TEM GROUND FAULT Failure description Over grid voltage Under grid voltage Over grid...

Страница 17: ...59 3 AS4777 VDE 0126 1 1 VDE 4105 CEI 0 21 CQC 31 30 9 Specifications Operating Range Utility Frequency Model The max DC input voltage MPPT operation range The max dc input current Number of MPPT stri...

Страница 18: ...rent Rated grid frequency Max Efficiency Protection Size mm Weight Topology Internal consumption Running temperature Ingress protection Interface Design lifetime Utility Monitoring Operation Surroundi...

Отзывы: