![Gilson Quad-Z 215 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/gilson/quad-z-215/quad-z-215_user-manual_2227692030.webp)
2-14
Installation
2
Final Z-Arm Adjustment
Follow these steps to adjust the Z-arm to the proper
height.
1 Turn off power to the liquid handler.
2 Locate the appropriate Z-height adjustment
tool in the accessory package. Two Z-height
adjustment tools are supplied in the package.
Part number
Description
25051094
125 mm Z-height adjustment tool.
Use this tool to adjust the Z-arm
on the Quad-Z 215 Liquid Handler
for liquid handling and injection.
25051095
175 mm Z-height adjustment tool.
Use this tool to adjust the Z-arm
on the Quad-Z 215 Liquid Handler
for liquid handling.
3 Place the Z-height adjustment tool on one of its
ends near the center of the locator plate (if
necessary, remove any racks or accessories
before doing this).
Final Z-Arm
Adjustment
Z-height
adjustment tool
Содержание Quad-Z 215
Страница 1: ...Quad Z 215 Liquid Handler User s Guide LT2545 2003 Gilson Inc All rights reserved April 2003...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 15: ...1 7 Introduction 1 Technical Specifications...
Страница 16: ...1 8 Introduction 1 Technical Specifications...
Страница 17: ...2 1 2 This section takes you through the steps for setting up your Quad Z 215 Liquid Handler Installation...
Страница 72: ......
Страница 73: ...5 1 5 Troubleshooting...
Страница 82: ......