background image

Page 4 of 5 

LT375008-04

GX-271 Liquid Handler Installation Qualification

Documents

In addition to this document, the following are provided. For reference purposes, specify the storage location for each. 

LT26141CD

Documentation CD, GX-271/274 Liquid Handlers

LT310180

Quality Control (QC) Checklist - GX-27X 

LT310181

Quality Control (QC) Checklist - GX-27X Z-Drive

LT255565

China RoHS

LT312270

Declaration of Conformity

LT315018

Unpacking Instructions

3. Installation

Locator Plate Setup

Refer to the appropriate procedures in 

Chapter 2, Installation

 in the 

GX-271 Liquid Handler User's Guide

.

Z-Arm Setup

Refer to the appropriate procedures in 

Chapter 2, Installation

 in the 

GX-271 Liquid Handler User's Guide

.

Plumbing Connections

Refer to the appropriate procedures in 

Chapter 2, Installation

 in the 

GX-271 Liquid Handler User's Guide

. For an optional 

accessory, refer to its appendix in the 

GX-271 Liquid Handler User's Guide.

Rear Panel Connections

Refer to the appropriate procedures in 

Chapter 2, Installation

 in the 

GX-271 Liquid Handler User's Guide

. For an optional 

accessory, refer to its appendix in the 

GX-271 Liquid Handler User's Guide.

Start Up

Refer to the appropriate procedures in 

Chapter 3, Operation

 in the 

GX-271 Liquid Handler User's Guide

. For an optional 

accessory, refer to its appendix in the 

GX-271 Liquid Handler User's Guide.

Отзывы: