![Gilian Gil Air Plus Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/gilian/gil-air-plus/gil-air-plus_manual_2227277004.webp)
IOM Sampling with the Gilian GilAir Plus Pump Procedure
4
Turning on calibrator:
1. Turn on the calibrator by holding down the power button until the light inside
turns on and the piston will drop.
Photo 4. Calibrator Powered On, Piston Dropped
2.
The “measure” option will be highlighted. Select “Enter.”
3. Use the
“right” arrow to scroll over to “CONT.” (Continuous) to run the calibrator
continuously until manually stopped.
4. Connect other end of tubing onto pump inlet.