13
then pull the retaining clip out from the
hole in the base (as pictured).
Handle Assembly:
• Assemble the handle by inserting the
upper handle (6) into the lower handle
(8). The detent ball will loack the two
pieces together.
• Rmove the Handle Socket Screw(10)
from the Handle Socket(12) put pump
handle into handle socket hole engaging
the universal joint of the release valve.
Ensure the handle is seated completely
into the socket then tighten the handle
socekt Screw (10).
Part List (Diagram 1)
Содержание 13646-0102
Страница 2: ......
Страница 7: ...5 Spr ngskiss 1...
Страница 9: ...7 Spr ngskiss 2...
Страница 17: ...15 Part List Diagram 2...
Страница 23: ...21 Deletegning 1...
Страница 25: ...23 Deletegning 2...
Страница 31: ...29 R j ytyskuva 1...
Страница 33: ...31 R j ytyskuva 2...
Страница 36: ......