3.3 Installation
Hazard
Do not overfill the cover!
The surroundings must not sink!
Hint
It is recommended that the metal of the fillable lid is pre-
treated with primer (e.g. CTW) before filling. This impro-
ves the adhesion of the fill material to the metal.
Have authorized personnel connect the electrical supply to the junction box and monitor the Campetto in
accordance with the following inspection schedule.
Hint
If the cover layer (1) is not strong enough, and the Campetto
was aligned with the levelling screws, the cavity between the
concrete foundation (2) and the frame must be filled with
concrete or an equivalent material.
The frame must rest on a solid underground.
The levelling screws and the bottom of the box have a no
effect on the overall stability.
Lid filling tol0/-1mm.