Campetto 6 Underfloor distributor system
Seite 7 / 13
Created
01.04.2014
ROEN
Modified
14.09.2020
ROEN
Object-ID
359746
Check drainage capacity!
The excavation work as well as the professional and standards-compliant installation must be performed by
the customer. It is important to ensure that the load capacity of the foundation and/or the cover layer corre-
sponds to the load capacity of the underfloor distributor system in order to prevent subsidence. Delivery of
concrete pipe has to be done on site by the customer.
Caution
If the Underfloor distributor system is to be used immediately after the excavation work, the installation pit must
absolutely be secured or locked so that it does not pose a safety risk!
3.2 Connecting underfloor distributor to power supply