Subject to alterations, 01.09.21
5/32
Technical specifications
7 Technical specifications
8 Boiler connection dimensions
Dimensions in mm
9 Mounting the gas jacket on the
boiler
The boiler connection plate must be prepared ac-
cording to the dimensions specified for the boiler
connection dimensions. You can use the gas-jacket
gasket as a template.
Screw the gas jacket to the boiler using the four
M10 fastening screws with washers and a size Allen
key. The air pressure switch for the gas train must be
at the top.
Burner type
Technical data
MG3-ZM-LN
Burner output in kW
450 - 2300
Gas type
for natural gas LL + E = “-N” , LPG = „L“
Method of operating
2-stage sliding / modulating
Voltage
230 / 400 V - 50 Hz
max. current consumption start/operatiopn
16,5 A max./ 11,4 A eff.
Electric motor power (at 2800min
-1
) in kW
4,5
Flame failure controller
Ionisation
Control box
LMV27
Weight in kg
120
Gas burner class
3
NOx Limit value
≤
80 mg/kWh
Air pressure connection
M12
Ø260
Ø328