
3
unit assembly & set-up (cont.)
HOSE SUPPORT BOOM ASSEMBLY (cont.)
•
Lift boom assembly and install into boom pivot
brackets on discharge stack, first slipping top
portion of vertical boom member into top
bracket on stack, then dropping bottom portion
into bottom bracket.
1
2
•
Catch S-hook on one end of boom support
chain (5:9) into chain eye at end of horizontal
boom member.
•
Slip other end of chain through eye clip atop
hose support band, then adjust chain length
between hose and boom to about three feet
(3/4 of total length) by slipping S-hook on end
of chain through appropriate mid-link.
BATTERY SERVICE AND CONNECTIONS
•
Fill battery with acid (auto parts store).
•
Connect battery cables (hardware not supplied), making careful note of polarity:
Long cable from engine goes to battery positive (+)
Short cable bolted to engine base next to battery box goes to battery ground (-)
•
Slip terminal covers on cables over battery terminals
Important Safety Note: Incorrect battery cable connection can result in
personal injury or equipment damage.