background image

 

MACHINE UNPACKING AND INSTALLATION 

 

WARNING:

 

The unit must be installed, opened and repaired by fully qualified technicians only. 

6.1 

UNPACKING 

Find the most suitable place where to put the machine, then remove it from the packaging and check that it is intact. The 
packing materials do not require special disposal as they are not dangerous or polluting. Refer to the local rules in force 
to discard them. 

6.2 

INSTALLATION 

The  machine  does  not  need  to  be  anchored  to  the  floor,  except  for  installation  on  self-moving  vehicles,  where  it  is 
necessary to use the holes on the base for the right attachment. 
For correct use and operation, as well as for easy maintenance, leave a free space around the machine. 
Do not put the machine in dangerous or flammable places. 

6.3 

ELECTRICAL CONNECTION 

Connect the machine to the power line as shown in the diagram, ensuring that the power supply voltage corresponds to 
that  indicated  on  the  rating  plate.  To  ensure  safe  connection  to  the  main  supply,  use  a  magnetothermal  switch  or 
otherwise a switch with fuses. 

 

WARNING:

  At  the  end  of  the  electrical  connection,  check  that  the  cables  are  well  fixed,  isolated  and  protected  from 

bumps. 

INSTRUCTIONS FOR USE 

 

7.1 

OPERATION 

 

Installation and maintenance must be carried out by qualified technicians only. 

 

Do not use the machine plunged in fluids, or in dangerous or flammable places. 

 

Do 

not ignore the dangers to the operator’s health and follow the hygienic and safety prescriptions. 

 

Always use piping suitable for operating pressures.

  

 

Make sure that the electrical wiring is carried out correctly according to the current regulations, and that the 
fuse blocks are closed and complete of fuses. 

 

Check that the safety and control devices of the boiler (pressure gauge, pressure switch and safety valve) 
are intact.

 

 

Check that the electrical wiring and the piping of the iron are intact and secure. 

7.2 

USE 

 

Verify the water level in the tank and add more water if necessary. 

 

Turn on the boiler and the iron. 

 

The boiler power supply is fed automatically by turning on the indicator light. 

 

The  boiler  reaches  the  operating  pressure  of  2.8  bar  after  a  few  minutes  and  the  related  light  turns  on 
automatically. 

 

The boiler is ready to supply steam. 

 

Absence of water in the boiler is indicated by the switching off of the two lights (boiler power supply and steam 
pressure).  

 

To top up the water it’s necessary to wait 2 or 3 minutes after the lights turn off. 

 

It’s possible to iron without completely filling the water tank. Using 1 litre of water provides a range of ironing time 
of 1 to 2 hours. To verify the amount of water added, simply insert the dipstick level into the boiler and cover the 
upper hole with your finger as you extract it.  

TROUBLESHOOTING AND SOLVING 

 

The  following  table  shows  the  main  problems  and  the  corresponding  causes  and  solutions.  In  case  of  doubts  or 
unresolved    problems,  do  not  look  for  the  trouble  by  removing  pieces  of  the  machine,  but  rather  contact  the  Technical 
Office or seller of Ghidini products. 
 

PROBLEMS AND SOLUTIONS 

TROUBLES 

POSSIBLE CAUSES 

SOLUTIONS 

The machine does not work. 

Main power failure 

Check that the supply terminals are live. 

Fuses are blown 

Check fuses. 

The boiler switch is on but the power 
supply and steam lamps are turned off. 

Absence of water in the boiler 

Refill water tank. 

Faulty safety thermostat. 

Replace thermostats. 

The boiler light and switch are on, but the 
boiler does not reach the requested 
operating pressure. 

Heaters are burnt out 

Check heaters. 

 

WARNING:

 If the safety valve is released, switch the boiler off immediately and contact a qualified technician. Do not 

block the exhaust and do not underestimate the severity of the problem, as there could be risk of explosion. 

Содержание SIMBA Mini

Страница 1: ...d Maintenance Manual WK 20 13 Manual drafted in compliance with EC Directive 98 37 Annex I paragraph 1 7 4 Manufacturer GHIDINI BENVENUTO s r l Product Boiler SIMBA Mini Year 2011 Certification ADN 04...

Страница 2: ...ons effected on the components of the machine or its different use without prior written authorization by Ghidini s r l relieve the latter of injury to persons and or damages to things voiding any war...

Страница 3: ...z 10 Z27A07 Complete trolley optional 3 22K050 Refill and safety cap 11 45G012 Pressure switch 4 Z18D00 Iron model K 12 162126 Iron rest tray 5 56B010 Swivelling wheels 13 46M028 Boiler casing 6 25A00...

Страница 4: ...minal board fixing 364291 Brass spacers 364259 Adjustable thermostat 364283 Handle cover for iron 364267 Complete microswitch for iron 364260 Thermostat with manual reset 364284 Rear cover for iron 36...

Страница 5: ...e switch and safety valve are intact Check that the electrical wiring and the piping of the iron are intact and secure 7 2 USE Verify the water level in the tank and add more water if necessary Turn o...

Страница 6: ...se of disassembling of pipes or components Noise The noise emission is not excessive because it remains under 70dB A 10 HAZARDOUS USE The verification of conformity to the essential safety rules and t...

Страница 7: ...7...

Страница 8: ...ng instructions 15 HANDLING AND TRANSPORT Before its transport the machine is carefully packed in a wooden cage During the transport and the stocking operations pay attention to warnings printed on th...

Страница 9: ...UNITY COUNCIL referring to machines 98 37 CE and to low tension BT 73 23 CEE and PED certificate 97 23 CE is built in conformity with the following laws and technical specifications in what can be app...

Отзывы: