
ECdrive H KIT
8
Pre-installation
5
Pre-installation
The most up-to-date diagram is applicable for performing the pre-installation work. All components must be
identified and installed in accordance with the drive drawing.
5.1 Cutting the track and cover to size
à
Track: Pos. 14 in assembly group list, Chapter 4.4
à
Cover: Pos. 11 in assembly group list, Chapter 4.4
X
Check profiles for damage.
X
Cut the track and cover to the required length
(see machining drawings, Chapter 4.1)
X
Clean the track and cover after machining.
5.2 Preparing the track
X
Push sliding blocks (1) and earth connectors (2) into the mounting groove in accordance with the drive diagram.
X
Screw on the earth connectors (2) using the screws (3) (torque 5 Nm).