www.geyserwise.co.za
22
Connect MPPT positive to DC pump and negative to ground.
Connect positive to DC pump and negative to ground.
Instruction
manual
SSR or MPPT Connection
Replace lid on control box and fasten properly.
Before you replace the lid it is important to do a final check on the electrics by comparing it to the
wiring as indicated on the lid.
Power up system
1. Switch on main supply at DB board.
2. Then switch on power at isolator switch.
MPPT CONNECTION
MPPT Positive
Plug MPPT connector cable into
the MPPT
MPPT Negative
1
3
2
www.geyserwise.co.za
Replace lid on control box and fasten properly.
Before you replace the lid it is important to do a final check on the electrics by comparing it to the
wiring as indicated on the lid.
Power up system
1. Switch on main supply at DB board.
2. Then switch on power at isolator switch.
1
2
Connect MPPT + and - or Solid state relay + and -
MPPT or SSR +
MPPT or SSR -
SSR OR MPPT CONNETION
13
Instruction
manual
SSR or MPPT Connection
PV System Installers Guide
______________
Installation of the element